15 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)
A group of buildings at a single renovation site under the control of the same owner or operator is called a:
A. Group
B. Installation
C. Renovation site
D. Facility
B. Installation
Nonfriable asbestos-containing materials, when dry, can be:
A. Crumbled
B. Pulverized
C. Reduced to powder by hand pressure
D. None of the above
D. None of the above
Category I nonfriable ACM that has become friable is considered:
A. Dangerous
B. ACM
C. Hazardous to health
D. RACM
D. RACM
Ceilings and nonload-supporting walls can be considered:
A. Structural members
B. Non-structural members
C. Load supporting members
D. Non-members
A. Structural members
Notification to NESHAP for demolition or renovation is required when removing less than 260 linear feet of RACM.
A. True
B. False
A. True
If you notify NESHAP that you are going to start a demolition/renovation project on a certain day, can you start it on a different day without notification?
A. Yes
B. No
B. No
During renovation operations, wetting is not required if:
A. Prior written approval from NESHAP is obtained
B. Prior written approval from the owner is obtained
C. Wetting is always required – no exceptions
D. None of the above
A. Prior written approval from NESHAP is obtained
When the temperature is too low to allow wetting procedures, the temperature must be measured during the day and the records of the temperature kept at the jobsite.
A. True
B. False
A. True
If a facility is demolished by intentional burning, all RACM including Category I and Category II nonfriable ACM must be removed in accordance with the NESHAP before burning.
A. True
B. False
A. True
Where RACM is not required to be removed prior to demolition, the ACWM may be transported and disposed of in bulk without bagging or wrapping.
A. True
B. False
A. True
ACWM means any waste that contains commercial asbestos.
A. True
B. False
A. True
Materials contaminated with asbestos, including disposable equipment and clothing, cannot be considered ACWM.
A. True
B. False
B. False
Intentionally burning a facility is considered:
A. Arson
B. Demolition
C. Renovation
D. Rehabilitation
B. Demolition
A residential building with four or fewer units is considered a facility.
A. True
B. False
A. True
Any source of emissions not controlled by an air pollution control device is called:
A. Fugitive source
B. Criminal trespass
C. Bypass dilemma
D. Contract waste
A. Fugitive source