Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
67 Cards in this Set
- Front
- Back
The ASD/SSC organization is composed of
what sections? |
Supply response
Component Control |
|
The supply response section of the
ASD/SSC consists of how many units? |
5
|
|
The programs management unit is directly
under what supply department section or unit? |
SRS
|
|
What section is responsible for managing
pre-expended bins? |
SRS
|
|
When MDU delivers an AVDLR item to
the squadron, what data in the requisition informs MDU that an immediate turn-in will NOT be available for pickup? |
Project code ZA9
|
|
Which of the following forms is used by
NALCOMIS activities as an issue document? |
DD Form 1348-1
|
|
What SRS unit is responsible for managing
high usage consumable items that have been expended from the supply records? |
PEB
|
|
To be included in the PEB, an item must be
maintenance related and have what minimum demand frequency per month? |
3
|
|
What unit of the SRS is responsible for the
verification of technical data? |
TRU
|
|
What copy or copies of the DD Form 1348
should material control sign for repairable? |
Original, green, and hardback
|
|
What copy of the DD Form 1348 does the
customer receive as proof of turn-in? |
Pink
|
|
Eligible material with unit costs over $150
can be included in the PEB when authorized by which of the following officials? |
CO
|
|
The quantity of each item pre-expended
may not exceed an estimated supply of what number of days? |
30 days
|
|
Stock records for PEB items should be
reviewed how often? |
Quarterly
|
|
As a minimum, a PEB item should be
purged if it had no demand for what total number of months? |
12 months
|
|
WHAT ARE THE 5 UNITS OF SRS
p pito medio tomates rojos |
RCU
TRU MDU PEB PMU |
|
SRS
|
SUPPLY RESPONSE SECTION
|
|
RCU
|
REQUISITION CONTROL UNIT
|
|
TRU
|
TECHNICAL RESEARCH UNIT
|
|
MDU
|
MATERIAL DELIVERY UNIT
|
|
PMU
|
PROGRAM MANAGMENT UNIT
|
|
What unit under ASD receives all requests for material requirements, prepares appropriate documentation, maintains appropriate files and
registers, and provides status to the customers. This unit also maintains the proof of delivery (POD) file. |
RCU (REQUISITION CONTROL UNIT)
|
|
TRU (TECHNICAL RESEARCH UNIT) responsible for
|
is responsible for the
verification of requisition data, such as part number, stock number, references, and other technical data |
|
PMU (PROGRAM MANAGEMENT UNIT) responsible for
|
PMU is responsible for processing and expediting high-priority requirements, such as NMCS/PMCS, broad arrow, work stoppage,
and EXREP. |
|
What unit under ASD contains high-usage,
maintenance-related consumable materials that have been expended from the supply department stock records and financial accounts. |
PEB (PRE-EXPENDED BIN UNIT)
|
|
What unit of the supply department
provides the daily status for all NMCS/PMCS requirements? |
PMU
|
|
Continuous reconciliation of outstanding
high priority requisitions between supply and maintenance activities is the responsibility of what SRS unit? |
TRU
|
|
Cancellation requests for issue groups 1
and 2 requisitions that were passed offstation are processed by what ASD/SSC unit? |
PMU
program management unit |
|
T/F
The DCU is responsible for rotatable pool components. |
FALSE
|
|
What unit of the CCS is responsible for all
repairable assets under the control of the SSC? |
LRCA
|
|
What section of the supply department is
responsible for performing inventory control over all repairable assets stored in the LCRA storage areas? |
The component control section
|
|
Which of the following units is NOT under
the component control section? |
Pre-expended bin
|
|
The procedures for the establishment of
retail requirement levels of consumable and repairable items afloat are contained in what instruction? |
FASOINST 4440.15
|
|
When the constrained TAT is computed for
allowances, what maximum time is allowed for AWP? |
20 days
|
|
Rotatable pools are part of what unit?
|
LRCA
|
|
What ASD/SSC unit is responsible for
processing all repairable items returned from the IMA? |
SSU
|
|
What organization may authorize a
redistribution of the OSI/fixed allowance assets of aviation items stocked by an activity? |
NAVICP
|
|
When computing a fixed allowance, the
total average turn-around time is limited to a maximum of how many constrained days? |
20
|
|
Redistribution of the aviation OSI/fixed
allowance assets of an activity can be ordered by an ICP to fill requisitions with what issue priority? |
Priority 1
|
|
Where practical, items designated
movement priority designator 03 should be retained awaiting shipment by SSU no longer than what period of time? |
1/2 workday
|
|
What NAVSUP form is used to request
changes in the fixed allowance of NAVICP-PHIL managed items? |
1375
|
|
Field level repairable items have an SM&R
code that limits their restoration to RFI in what level of maintenance? |
Intermediate
|
|
How many section does CCS (component control section) consists of?
|
4
|
|
What are the section in CCS (componet control section)
dame la almoada sucia |
DCU-document control unit
LRCA-local repair cycle asset storage unit SSU-supply screening unit AWP-awaiting parts |
|
What unit under ASD is responsible for the control of all non-RFI components in the IMA repair cycle (except rotatable pool components). The DCU also maintains control of components awaiting turn-in<BR>from customers
|
DCU
|
|
What is the LRCA (LOCAL REPAIR CYCLE ASSET STORAGE UNIT) responsible for?
|
LRCA is responsible for the receipt, storage, issue, and
accountability of repairable assets for ASD/SSC. This includes items in the rotatable pool. |
|
What is the SSU (SUPPLY SCREENING UNIT) Responsible for?
|
SSU is responsible for processing all
items returned from the IMA also responsible for preparing retrograde for shipment via ATAC within 2 working days. |
|
What is AWP responsible for?
|
responsible for receiving, storing, and
controlling all AWP components returned from the IMA |
|
What is purpose code W assigned to?
|
is assigned to the OSI retail
level and consists of aviation depot-level repairable (AVDLR) and field level repairable (FLR). |
|
What purpose code is assigned to the supplemental aviation spares support requirements.
|
L
|
|
Purpose code assigned to the wholesale
FLR and AVDLR that are not part of the authorized site fixed allowance. |
A
|
|
T/F
Every section or unit concerned with repairable must make sure BCM DLRs are handled quickly. |
TRUE
|
|
For effective AWP management, what
minimum standard accuracy rate of outstanding requisitions and requisition inventory records must be maintained through weekly reviews? |
98%
|
|
The ASD/SSC is holding an EI/QDR
exhibit awaiting disposition instructions. According to OPNAVINST 4790.2, what maximum number of days should ASD/SSC hold the exhibit before performing the next action? |
30 days
|
|
Supply and maintenance personnel must
review the AWP when the number of components on hand exceeds what percent of the average monthly IMA inductions? |
15%
|
|
The material for an EI/QDR exhibit is
assigned what Condition code? |
L
|
|
When a part for a component undergoing
repair is not available, the component is in what status? |
AWP
|
|
The shipping documents for material
exhibits must be stamped with "EI" or "QDR." What is the prescribed size of the lettering? |
3 in.
|
|
Which of the following statements
describes a function of the AWP unit? |
It establishes holding areas for AWP units
It establishes staging areas for AWP components |
|
What form is used to request depot
customer service? |
OPNAV 4790/36A
|
|
Weapons system support under the
OSI/fixed allowance concept is outlined in which of the following instructions? |
FASOINST 4441.16
|
|
Which of the following activities are
responsible for computing the onboard repair part and equipage requirements? |
ICPs
|
|
Allowance change request-fixed (ACR-F)
should be submitted on which of the following forms? |
NAVSUP Form 1375
|
|
What office or command prepares the
AVCAL? |
NAVICP
|
|
Which of the following allowance lists
prepared by NAVICP contains repairable items and subassemblies required by shore stations? |
SHORCAL
|
|
T/F
The operational support inventory (OSI) is a retail stock level comprised only of DLRs. |
FALSE
|
|
What is the OSI comprise of?
|
fixed allowance for
DLR FLRs Consumables |