• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/114

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

114 Cards in this Set

  • Front
  • Back
How many character number is the JCN?
9, 10, or 11
Who assigns JCN?
PC
What allows for separate identification of each maintenance action?
JCN
How many parts is JCN composed of?
4
What are the four parts of JCN?
ORG code
Day
Serial Number
Suffix
What identifies the organization that originally assigns a JCN?
ORG Code
ORG Code is a alphanumeric code with how many character?
3
Day was the date the JCN was assigned to what?
a maintenance action
Day reflects the date on which the work was actually started. (True/False)
False
Day is a three-character numeric code specifying what?
the day of the year
The serial number is either a three character number that runs sequentially from 001 to 999, or a three character alphanumeric number. (True/False)
True
Who uses the suffix (JCN)?
IMA
What provides automatic assignment of JCNs?
NALCOMIS
NALCOMIS will print two MAFs for whom?
Production Control and the work center
SMQ stands for?
SPECIAL MAINTENANCE QUALIFICATION
Who assigns work priority?
AMSU personnel with the appropriate SMQ
Who can also assigns a work priority?
Production Control
Before assign the DDSN generated, Production Control will have to?
assign a project code and issue priority code
What the MAF JS does the work center change to in transit to AWP locker?
WT
WQ means what?
Gear in AWP locker
What the MAF JS will be upgraded to when in transit from AWP unit to work center?
WB
When does AWP unit changes MAF JS to WB?
When all parts (ordered) are received
AWP stands for?
AWAITING PARTS
When does NALCOMIS create the mailbox message for "CDI Approval Required" or "QA Approval Required"?
JS changes to JC
Upon CDI or QA approval, what message does NALCOMIS create?
Supervisor Required
Who has to approve MAF before P/C Review?
Work Center Supervisor
Two copies of the completed MAF go to where?
one routed with the component and the other one is retained by the work center
DIFM stands for?
DUE IN FROM MAINTENANCE
Where to deliver the RFI/BCM component?
ASD
What comes with the RFI/BCM component to the ASD?
the completed MAF, AESR, MSR, ASR, EHR, or SRC card and RFI/BCM tag
AESR stands for?
AERONAUTICAL EQUIPMENT SERVICE RECORD
MSR stands for?
MODULE SERVICE RECORD
ASR stands for?
ASSEMBLY SERVICE RECORD
EHR stands for?
EQUIPMENT HISTORY RECORD
SRC stands for?
SCHEDULED REMOVAL COMPONENT
Upon Logs and Records review, two copies of the completed MAF go to?
Production Control's historical files and
QA review.
How long does Production Control's historical files stay?
for a minimum of 6 months
When will a copy of the assist MAF be provided to the primary work center?
when the assist MAF has been completed
What is the D action MAF for?
the defective component
AMSU stands for?
AERONAUTICAL MATERIAL SCREENING UNIT
UIC stands for?
UNIT IDENTIFICATION CODE
What must Supply receive with the defective component for Repair and Return?
D action MAF, NTCSS Optimized OMA NALCOMIS CM ALS records, and DOD Single Line Item Release Receipt Document (DD 1348-1)
Who must fill in the Repair and Return, and the Owed Org field when inducts MAF?
AMSU
What happens to components shipped as RFI but without an RFI tag?
be inducted into the IMA for check and test.
CCS stands for?
COMPONENT CONTROL SECTION
What defines "diligent supervision at the work center level"?
rigidly adhering to the procedures and policies established by NAMP
Successful accomplishment of assigned tasks of the IMA could be attributed to whom?
work center supervisors
What shall to be done to ensure the accomplishment of all assigned work?
Maximum efficiency be obtained and maintained in the use of manpower, material, and facilities.
What is the primary job of the work center?
be responsive to the hour-by-hour maintenance situation.
What must the Work Center Supervisor keep Production Control constantly notified?
a. Bench/test equipment status.
b. Availability of skills (personnel).
c. Changes in status of assigned maintenance
d. Anything which may affect the ability of the work center to maintain the systems assigned
What machine reports does the Work Center Supervisor use on a regular basis?
the daily and monthly NALCOMIS and MDRs
MDR stands for?
MASTER DATA RECORD OR MAINTENANCE DATA REPORT/REPORTING
NALCOMIS stands for?
NAVAL AVIATION LOGISTICS COMMAND MANAGEMENT INFORMATION SYSTEM
What NALCOMIS Reports does the work center supervisor use on regular basis?
The Work Center Workload Report
The Equipment Discrepancy Report
The Due In From Maintenance Report
The Daily Production Report
What is the Work Center Workload Report?
the NALCOMIS VIDS board
What report lists all outstanding discrepancies not signed off by Production Control?
The Work Center Workload Report
VIDS stands for?
VISUAL INFORMATION DISPLAY SYSTEM
What report monitors job status?
Due In From Maintenance Report
What report monitors supply status for AWP requirements?
Due In From Maintenance Report
What report can explore cannibalization/transpose possibilities?
Due In From Maintenance Report
What report lists all completed maintenance actions signed off by Production Control?
The Daily Production Report - Part 1
Maintenance actions can be totaled by what?
priority, transaction codes, and action taken codes
What provides a count of all maintenance actions accomplished?
The Daily Production Report - Part 2
What report can help the Work Center Supervisor to validate the MAF submissions from the previous day?
VIDS/MAF COPY 1 DAR
What is MDR-2?
Monthly Production Report
What report is a summation of all mainte-nance actions, TD compliances?
Monthly Production Report
What report has a suumary of data entered in the FAILED REQUIRED MATERIAL field of the MAF?
Monthly Production Report
How often should DARs be verified?
daily
How often do all work centers verify their work center workload reports against the actual component and status inducted to their work centers?
on a daily basis
MAF data is maintained and updated on what basis through on-line functions?
a continuing basis
What is DD 1574?
Serviceable Tag - Materiel (RFI) tag
What is DD 1577-2?
Unserviceable (Reparable) (BCM) tag
How long will this the hard copy tag remains attached to the component?
til the component is used or destroyed
What is the purpose of a MAF in a temporary file at the work center?
pending verification against the DAR
Who must ensure that work center personnel know the procedures for ordering parts to repair WRAs and SRAs?
The Work Center Supervisor
Within how many hours if the item is not available, work center changes JS into WT?
24hours
What becomes the turn-in document number, if a repairable SRA is requisitioned?
the DDSN
What is WB?
in transit from AWP unit to work center
High usage piece parts are available in where?
PEB
PEB stands for?
PRE-EXPENDED BIN
Who has the responsibility stocking of PEBs?
ASD
ASD stands for?
AVIATION SUPPLY DEPARTMENT
Where will the inputs for PEBs stocking will originate?
at the work center.
What the work center supervisor note in NALCOMIS upon task assignment?
the tool container number
What shall be conducted by the technician prior to commencement of each task?
A sight inventory
All shortages of tools shall be noted on what?
the toolbox inventory card
When shall tool inventories be conducted?
when a work stoppage occurs, after maintenance has been completed, and before conducting an operational systems check on the equipment.
Whom shall be notified if the missing tool cannot be located?
Production Control
Where on the MAF shall "that a lost tool investigation was conducted and the tool could not be found" be entered, after MO's directed search?
the Corrective Action field
Who shall assist the Work Center Supervisor in complying with the Tool Control Program?
CDIs
MIS stands for?
Maintenance Information Systems
What shall be used by IMAs as a tool for inventory management of assigned SE?
IRIL board or SESS
IRIL stands for?
ISSUE/RECEIPT/INVENTORY AND LOCATION
SESS stands for?
SUPPORT EQUIPMENT STANDARDIZATION SYSTEM
What provides a display of SE assigned to the SE Division for management?
IRIL board
SESS does not provide a method to control production and show current job status (IN WORK, AWP, AWM). (True/False)
True
How long will completed MAF data be stored in the NALCOMIS database?
6 months from completion date,
How long will documents in support of PM inspections be stored in the NALCOMIS database?
6 months or one complete inspection cycle, whichever is greater
Effective control of maintenance is dependent on what?
the availability of easily identifiable status of all maintenance resources
What is the most efficient method of quick reference to most of those resources for activities not supported by NALCOMIS IMA?
use of the VIDS board
VIDS stands for?
VISUAL INFORMATION DISPLAY SYSTEM
What situation activities may also find using the VIDS board a beneficial contingency option?
experiencing NALCOMIS IMA downtime in excess of 5 working days
Colored tab Green means?
LRCA is pool critical
Colored tab Blue means?
LRCA is pool zero
Colored tab Red means?
EXREP
LRCA stands for?
LOCAL REPAIR CYCLE ASSET
Which VIDS/MAF copy is retained for MDS validation by the work center?
5
Which VIDS/MAF Copy is placed on the Production Control VIDS board?
3
Which VIDS/MAF copy AMSU returns o SSC?
2
Which VIDS/MAF copy is always attached to component and Material Condition Tag?
4
Which VIDS/MAF copy Production Control forwards to QA for data entry?
1
VIDS/MAF Copy 3 is held in the suspense file on Production Control board until?
Copy 1 is returned from data entry
What is used on the MAF as the WUC for conditional and acceptance/transfer inspections?
030
What is used on the MAF as the WUC for preserva-tion/depreservation?
049