What 4 items are developed in this phase |
Lesson plan Trainee guide IMM Test & test plan |
|
Where are LPs and TGs made |
AIM / LOM |
|
How are lesson planes laid out |
Landscape |
|
What is included in a LP |
Lesson topics Front matter |
|
What is on the left / right of a LP |
Discussion points (left) Related instructor activity (right) |
|
What is included in a TG |
Front matter Instruction sheets |
|
What are the types of instruction sheets |
Outline sheets Job sheets Problem sheets Assignment sheets Information sheets Diagram sheets |
|
What type of instruction sheet is mandatory |
Outline sheets |
|
What will front matter include |
Title page Table of contents Terminal objectives Safety Security Change record |
|
Where is the interim package sent |
User activities Participating activities |
|
UAs and PAs send what back and when |
User activity review statement UARS Within 30 days of getting the interim package |
|
After receiving the UARS what is done? |
Conduct a POA&M |
|
What is the POA&M conducted for |
To validate timelines, resources, and materials |
|
After the POA&M what is done |
Send pre-pilot package to HQ |
|
When is the Pre-pilot sent |
45 days prior to pilot for existing course 90 days prior for new course |
|
What do you verify when piloting the course |
Length of course LOs are achievable Course materials |
|
What is done after the course is piloted |
Draft a pilot course monitor report PCMR |
|
When is the PCMR submitted |
Within 30 days after the Pilot grad date |