Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
7 Cards in this Set
- Front
- Back
State the purpose of a Training Project Plan (TTP). |
Describes all training and training support elements required to provide trained personnel to operate and maintain systems or equipment, or to perform tasks and functions. • It provides a Plan of Action and Milestones (POA&M) to achieve a predetermined implementation date. • It describes all the factors necessary to prepare and conduct a successful training program and attain optimum use of personnel, hardware, and funds. • It should meet, and not exceed, the training requirement. |
|
Who has initial approval authority of a TPP? |
CCA |
|
Who approves implementation of a TPP when: - Has zero sum gain - Requires additional resources or offsets |
- NETC N7 - OPNAV |
|
Explain the contents of a TPP. (NAVEDTRA 130, Ch 2, Sect 7) |
-CCA TPP endorsement letter |
|
Describe the web application SERENA. |
Allows Learning Centers to upload, maintain, and manage TPPs. |
|
What type of TPPs housed in SERENA? |
All Learning Center TPPs, new, revised, modified, and deactivated. Has the capability to archive and provide a suspense location for TPPs requiring offsets and the Resource sponsor has not been identified. |
|
How are TPPs are identified and maintained in SERENA? |
TPP is serialized by first available number in the system. Not serialized by Learning Center, however, TPPs are seperated by Learning Center for ease of retrieval. |