• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/50

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

50 Cards in this Set

  • Front
  • Back

Who can supervise MRT Missle Reload?

Certified Commissioned Officer, Warrant Officer, NCO (E6 or above)

When operating the forklift, the automatic forklift level switch will be placed in the ______ position.

Off

The forklift operator can select one of three steering modes. What are they?

2 wheel, 4 wheel, and Crab Wheel

The Tilt Warning System will sound when the crane and vehicle are tilted to _____ degrees.

5 Degrees

How many times is a MRCTS test performed on a PAC-2 LS cable prior to hooking up to a missile canister?

Two consecutive Pass, or Pass no-go Pass

True or False. You are not required to turn on the Missile Heaters circuit breakers for the LS if you are operating in temperatures above 32°F.

False

True or false. The Patriot LS TM gives warnings on explosives​ to include the Missiles.

True

If the top corners of the Missile Canisters are painted with a 4-inch Yellow Square the Missile is a _______.

Live Round

True or False. If the wood runner on a missile canister has cracks that exceed five inches in length and extend completely through the runner, it is considered unserviceable.

True

What manual contains the steps and procedures for Missile Selectability?

TM 9-1440-1600-10

True or False. PAC-2 / PAC-3 ELES launcher can be configured to fire both at the same time.

False

What does the acronym MRCTS stand for?

Missile Round Cable Test Set

True or False. The PAC-2 LS operator's manual has the meeting for the MRCTS failure codes.

False

What should you NOT do if a tipping condition is encountered with the GMT?

Lower or extend the boom. As this will aggravate the condition.

You are required to replace the GMT cable when you find _____ random distributed wires, or _____ broken wires and a strand.

6 Random, 3 Broken

What is the load rating on the GMT crane at maximum extension?

4500 Pounds

True or False. For the GMT crane, always wear protective gloves when handling winch wire ropes, and never operate a winch with less than 3 turns of a wire rope in the winch drum.

False

True or False. The Load Test due date and the Load Rating are not required to be stenciled on the GMT crane due to the fact you have Load Test paperwork on hand.

False

True or False. During the load test procedures for the GMT crane, you disengage the PTO and shut off the vehicle engine to test the crane for slippage.

False

How many, and at what locations on the GMT are the high idle switches​ located?

3. Center Console, behind passenger in front of cargo hold, and Crain Controls

What status code is used on the DA Form 5988-E of the GMT for a PTO light that is inoperable?

( x ) Deadline

For Forklift Reload Operations, the maximum capacity rating for the Forklift is?

10,000 Pounds

How many Soldiers are required to conduct Missile Reload Operations?

5

Name all positions by CM# for forklift Reload.

CM1: CM1


CM2: CM2


CM3: Saftey


CM4: Operator


CM5: Signal

The Missile Tie Down Bolts are torqued to what foot pounds?

60 ft/lbs (Foot Pounds)

During Tactical Operations, before approaching the LS you must get permission from?

The ECS

During Forklift Missile Reload, the forks must extend no further than _____ inches past the Missile prior to lifting.

6 Inches

Hearing protection is required within ______ meters of the LS.

10 Meters

What Gunnery table is Crew Forklift and GMT Missile Reload conducted?

Table V

Define the terms Centralized and Decentralized reload in your own words.

Centralized Reload refers to a predetermined reload area (i.e. an MSA), where you bring the launching station to the site.



Decentralized reload occurs in a tactical deployment position, where in LS is emplaced.

True or False. The launcher enable/Disable switch is set to disable to prevent inadvertent launch command signals from the ECS when electrical power is applied.

True

True or false. CM1 and CM2 may underground expended canisters prior to emplacing the GMT.

False

What is the minimum size area do you need during GMT Missile Reload.

20 x 25 Meters

True or False. The maximum stacking height for Patriot Missile Canisters in an MSA is four.

True

What color are the 4 inch square markings on top left front, and top right rear corners of the Patriot missile canister for a Missile Round Trainer (Dummy Canister).

Bronze

True or False. Patriot Missiles must be grounded when stored in a wooden or open storage magazine.

True

What color is marked in 4 inch squares on the top left front, and top right rear corners of the Patriot missile canister for a live missile?

Yellow

What is the minimum safe distance from a damaged Canisters with a live Missile Round?

1250 Feet / 381 Meters

What is the status code you use for a Quick-Release Plunger (Torque Tube Handle) that is broken or missing?

( x ) Deadline

What size socket is used to tighten the Torque Tie-Down bolts on the Patriot Missile Canisters?

3/4 Inch Deep Well

What are the 3 LS/GMT reload positions?

Parallel, Perpendicular, and End-to-End

The maximum number of expended canisters can be moved at one time with a GMT is ______ .

2 Expended Canisters

Who is responsible for the PMCS of the beam during GMT Missile reload?

CM3 (Safety)

The maximum allowable slope for a GMT Missile Reload, front to back and side to side, is how many degrees?

10 Degrees

How many fire extinguishers are required to perform a Reload Operation?

4

If the GMT Crane Operator loses sight of the Signal, what should the operator do?

Cease operations until visibility is restored

How often is the GMT load tested?

Every 12 Months

A GMT Missile Reload crew has _____ minutes to conduct Missile Reload.

60 Minutes

True or False. 'Stray/No voltage tests' are conducted prior to the 'test launch' test on ELES.

True

Beam inspection criteria can be found in what manual?

TC 44-635-14