• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/30

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

30 Cards in this Set

  • Front
  • Back

_______ ____ are high volume production systems

assembly lines

What is scheduling?

establishing the timing of the use of equipment, facilities, and employees in an organization

What is a technique for a high volume system?

line balancing is a scheduling technique for high volume systems

High volume is the ...

ultimate planning horizon

You are supposed to ________ for medium volume

plan

With medium volume systems you are determining the ____ and when you set up a ______ _______ _____/_______

timing


reorder point systems


MPR

Low volume has to deal with ____ products.

customized

What is scheduling?

scheduling is only a week/day

Planning is for a _________

month

Scheduling is used to establish the ____ of something

timing

What is sequencing?

the order in which you do things

What is a single workcenter?

this means you are scheduling a resource that can only do things one at a time.

With scheduling a single workcenter, the question is...

what do i do next

What is processing time?

the time that it will take to do something

What is scheduled departure?

deadline

What is the formula of flow time?

Flowtime of period before+ processing time

What is a make span?

The make span of a schedule is how long it takes you to complete the whole schedule from start to finsih

_____ is when you will be done with a certain step

flowtime

Flowtime of the last job in the sequence equals...

sum of processing time.

The dynamic rule is...

updated everytime you make a decision

what is the formula of a critical ratio?

time remaining/work remaining

What is critical ratio?

how much time you have before you overrun the deadline

The ___ signal is the most critical

smallest

What is the formula of tardiness in the dynamic rule?

flow time- due date

Can tardiness be negative?

no. if the calculation is negative, it is written as zero.

If the critical ration is less than one, it is...

going to be late

If the ratio is negative, it means that...

it is late

What rule is used when you are scheduling two workstations?

johnsons rule

What is the purpose of johnsons rule?

minimizes the makespan of the schedule

What are the three steps to johnsons rule?

(1) Select the job with the shortest time any workcenter. If that time refers to the first workcenter, schedule that job first. If that job refers to the second workcenter, schedule that job last.




(2) Cross that job off your list.




(3) Repeat steps 1 and 2 with remaining data, until all jobs are scheduled.