9 Cards in this Set

  • Front
  • Back
Structural metals are purchase by the ---.
Ton
Erecting steel structures depends on: (4)
Weather Conditions
Equipment Available
Size of the building
Bolting or welding
What are the components?
Beam: W12x30
W : Type - Wide Flange
12 : Depth - 12 Inches
30 : Weight per food - 30 lbs per foot
What are the components?
Webbing: 18K3
18 : Depth
K : Type
3 : Width
Metal Decking Pricing
Base Price is based upon number of --- but sold by --.
Fasting could be with ----, -----, or -----.
squares (100ft^2); square foot
Welding, clipping, or bolting
Most of the time, subcontractors can erect structural steel at considerable savings compare to the cost average of general contractors. Why? (3)

If using subcontracts, what is the estimators job?
(1) Specialized workforce
(2) Required Equipment
(3) Experience

Cost Control
Miscellaneous Metals (2)
Metal Fabrications - stairs, railings, ladders, ect
Ornamental Metals - ornamental doors or gates
Review Bare Cost Analysis and calculating O&P using Labor Add-ons

in example

Example 2 (Metals I)
Do it!
Factors influencing total price of structural
steel which may be calculated as extras to the
base price: (7)
(1)High strength
(2)Quantity
(3)Size: refer to 05 12 23.40
(4)Cut lengths: refer to 05 05 21.10
(5)Drilling: refer to 05 05 21.15
(6)Cambering
(7)Galvanizing: refer to 05 05 13.50