• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/33

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

33 Cards in this Set

  • Front
  • Back

What is outlets do class 3 standpipes have?

1 1/2" and 2 1/2"

What is the temporary standpipe is permitted in building under construction provided?

It can supply 75 gallons per minute at 50 psi and is at least 4 in diameter

Class 2 standpipes must be designed for a minimum flow of what gpm for one outlet?

100

Sleeves are required on a multifloor structure. If missed what could be the consequences?

Extra expenses may result due to cutting of electrical wire or reinforced steel

A dry pilot line must be constructed of what type of pipe?

Galvanized steel or copper tubing

What device is used to limit the time response of the air supply in a pre-action system

A restricted orifice

Where supervisory air is used to maintain pressure, and an alarm will sound if the pressure drops below what pressure?

12 PSI

Double interlocked pre-action systems are commonly used in?

Freezers

A common characteristics of all deluge and pre-action system, regardless of the method of release is?

A manual release

The NFPA document that should be consulted for information of a centrifugal fire pump is what?

NFPA 20

In a centrifugal fire pump, the water is drawn in at the center of and slung outward to the rim of the?

Impeller

The interconnecting piping for jockey pump controller sensing lines is required by NFPA to be what nominal diameter?

1/2" pipe

Where sprinkler or nozzle orifice sizes are less than 3/8", what device is required to prevent plugging of the orifice?

A strainer

Initial filling procedures for a foam system bladder tank are specified by?

The manufacturer

Water supply testing farthest sprinkler system provides static and residual pressure and the what of the water

Flow

A sprinkler system in which parallel crossmains are connected by multiple branch lines is called a what configuration?

Gridded system

High piled storage generally refers to storage over what feet in height?

12 feet

Office space that does not contain machines or storage and the quantity and combustibility of content is low would be considered what occupancy?

Light hazard occupancy

An occupancy where combustibility is low, quantity of combustibles is moderate, stockpiles of combustibles do not exceed 8 feet, and fires with moderate rates of heat release are expected is classified as a(n) what occupancy?

Ordinary hazard group 2

The difference between extra hazard group 1 occupancy and extra hazard group 2 occupancy is what?

The amount of flammable liquids present

The ordinary hazard pipe scheduled differs from light hazard in that if the distance is greater than what feet, the main size is increased?

12 feet

The rate of water application in gallons per minute per one square foot of coverage is the?

Destiny

The NFPA standard for one and two family dwelling and mobile homes is?

NFPA 13d

The friction loss for valves and fittings are expressed in terms of?

Equivalent feet of pipe

The underground piping test procedure is conducted at 200 PSI water pressure or a minimum of what PSI above the anticipated static water pressure, if greater than 150 psi.

50 psi

The underground piping test procedure is conducted for how many hours?

2 hours

The NFPA standard that must be used when testing fire protection systems is what, replacing the now obsolete NFPA 13A

NFPA 25

With antifreeze systems, the freeze point of the antifreeze must be tested when?

Annually

Maintaining the system and keeping the system in good operating condition is responsibility of who

Owner

When testing two valve, double-interlocked system, the cavity between the deluge valve and the dry pipe valve must be?

Filled with water

Dry pipe or pre-action sprinkler system piping that protects or passes through freezers or cold storage rooms must be visually inspected when?

Annually

First day of projects involves?

Materials and tool deliveries

The contractors material and test certificates require?