26 Cards in this Set
- Front
- Back
Before you can schedule production, you need to re-run MRP due to a possible change in the BOM .
True or Flase |
True
|
|
What is the main MRP output?
|
planned outputs
|
|
What are some production types:
(ex:make-to-stock) |
process manufacturing
repetitive manaufacturing product-orientated production kanban make-to-stock |
|
What are some task lists?
|
routings
rate routings master recipes |
|
What can be assigned to routings?
|
Work centers and PRTS
|
|
What can BOMs be used for?
(think department functions) |
MRP
production procurement product costing |
|
Can you enter default values for the operation to be excecuted at a resource?
T or F? |
True
|
|
Avalaible capacities of resources are used for scheduling?
T or F? |
True
|
|
In order to calculate costs for production, what is needed?
|
forumala keys
|
|
what is "mass processing"?
|
mass release of operations/resources
|
|
A routing is defined using:
|
group counter or routing group
|
|
is a workcenter assigned to an operation?
T or F? |
true
|
|
what is the purpose of a "scheduling basis"?
|
determine which capacities are relevant for scheduling
|
|
Which master data do you execute "component allocations"?
|
inside routing
|
|
What are some options when creation BOMs?
|
create without routing or BOm
create with routing create with routing and BOM create with planned order |
|
Are costs determined at an operational level?
T or F? |
True
|
|
When an order is released, what happens?
|
a staus is set accordingly such as:
created or saved |
|
What are some "release options"?
|
individual
whole order several orders |
|
Do "statuses" manage production orders?
T or F? |
True
|
|
What determines the debit/credit methodology for production orders?
|
cost object controlling variant
|
|
Does order settlement debit the order?
T or F? |
False, it credits it.
|
|
What are the results of "inspections"?
|
assigning of confirmed quantities
material status is updated missing parts are recorded |
|
what are some costs associated with production orders?
|
material
production external activities process overhead |
|
Does settlement make a financancial posting to WIP account?
T or F? |
True
|
|
what is the "Basis" for information systems for order managment?
|
orders
order structures and operations missing parts recording cost objects BW infocubes LIS library |
|
what are some "control functions" for work centers?
|
set-up time
labor time |