• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/14

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

14 Cards in this Set

  • Front
  • Back
MDR 2


Monthly Production Report




Use: reports maintenance action needed for w/c.

MDR 3

JCN Consolidation Report




Use: list for TDC actions to be submitted for the current month.

MDR 4-1

O Level Technical Directive Report
MDR 4-2

I Level Technical Directive Report
MDR 5


Maintenance Action By System Bureau/Serial # Report




Use: cost in man-hours, to support single a/c.

MDR 6

Maintenance Action By System and Component Report.




Use: identify man hours for establishment of cause for failure of a component.

MDR 7

Component Repair/BCM Report.




Use: determines % repaired/ not repaired.

MDR 8


Failed Part and Parts Required Report.




Use: Prepped from VIDS/MAF copy 1. Verifies # of parts and assemblies that cause backlog.

MDR 9

Repair Cycle Data Report.




Use: turnaround time for repairable components.

MDR 10

FOD Report
MDR 11

Corrosion Control/Treatment Report
MDR 12


No Defect Report.




Use: amount of time and effort w/o malfunction and had zero duplications.

MDR 13


When Malfunction Was Discovered Report




Use: # of abort malfunctions before or in flight.

MDR REPORTS