Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
6 Cards in this Set
- Front
- Back
What Army Regulation covers the Army Material Maintenance Policy? |
AR 750-1 |
|
What are the 4 levels of maintenance? |
Unit, Direct Support, General Support, Depot |
|
What does PMCS stand for? |
Preventative Maintenance Service and Checks |
|
When is PMCS required? |
Before, during and after the operation of a piece of equipment and also weekly and monthly |
|
Who is required to perform a PMCS? |
Every operator who is assigned a piece of equipment |
|
Why does QAQC mean? |
Quality Assurance/ Quality Checks |