Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
13 Cards in this Set
- Front
- Back
support high-performance,cost-effective project outcomes through an early analysis of the interrelationships among systems |
integrative process
|
|
(strategy) perform "simple box" energy modeling analysis before the end of schematic design |
integrative process |
|
(strategy) assess at least 2 of the following: site conditions; massing and orientation; basic envelope attributes; lighting levels; thermal comfort ranges; plug & process loads; programmatic & operational parameters |
integrative process |
|
(strategy) perform a preliminary water budget analysis before end of schematic design. consider indoor, outdoor & process water demand, & supply sources |
integrative process |
|
IP |
integrative process |
|
LT |
Location and Transportation |
|
SS |
Sustainable Sites |
|
WE |
Water Efficiency |
|
MR |
Materials and Resources |
|
EA |
Energy and Atmosphere |
|
IEQ |
Indoor Environmental Quality |
|
IN |
innovation
|
|
RP |
Regional Priority |