41 Cards in this Set

  • Front
  • Back
How many credits for erosion and sediment control ?
None, it's a prerequisite to the Sustainable Sites credits.
How many points are available in the Sustainable Sites catagory?
Fourteen (14)
How many and what credits are available for SSc4 Alternative Transportation?
Four (4): SSc4.1 Public Transportation; SSc4.2 Bycicle Storage & Changing Rooms; SSc4.3 Alternative Fuel Vehicles; SSc4.4 Parking Capacity
How many and what points are available for SSc3 Redevelopment of Contaminated Sites?
One (1): SSc3 Redevelopment of Contaminated Sites
How many and what points are available for SSc1 Site Selection?
One (1): SSc1 Site Selection
How many and what points are available for SSc2 Development Density?
One (1): SSc2 Development Density
How many and what points are available for SSc5 Reduced Site Disturbance?
Two (2): SSc5.1 Protect or Restore Open Space; SSc5.2 Development Footprint
How many and what points are available for SSc6 Stormwater Management?
Two (2): SSc6.1 Rate and Quantity; SSc6.2 Treatment
How many and what points are available for SSc7 Heat Island Effect?
Two (2): SSc7.1 Non Roof; SSc7.2 Roof
How many and what points are available for SSc8 Light Pollution Reduction?
One (1): SSc8 Heat Island Effect
What is the purpose of SSp1 Erosion & Sedimentation Control?
Control erosion to reduce impacts on water and air quality.
How do you acheive credit SSp1 Erosion & Sedimentation Control?
In general: 1) Identify soil composition 2) Uncover potential site problems 3) Develop mitigation strategies
What are the Stabilization technologies available to control erosion & sedimentation?
Temporary Seeding; Permanent Seeding; Mulching
What are the Structural Control technologies available to control erosion & sedimentation?
Earth Dike; Silt Fence; Sediment Trap; Sediment Basin
What is the intent of credit SSc1 Site Selection?
Avoid development of inappropriate site and reduce env. Impact from the location of building on a site.
What are the requirements of credit SSc1 Site Selection?
Don't build: ALR or FLR; undvlped land <1500mm (5') 100yr fld or <900mm (3') 200yr fld; endangered species; parkland; 30.5m (100') wetland; eco sensitive
What is the intent of credit SSc2 Development Density?
Channel development to urban areas with existing infrastructure, protect greenfields and preserve habitat & natural resources.
What are the requirements of credit SSc2 Development Density?
Increase localazed desity by utilizing sites located within and existing min development desity of 13,800m2/hectare (60,000sf/acre)
What is the intent of credit SSc3 Redevelopment of Contaminated Sites?
Rehab damaged sites where development is complicated by environmental contamination, reducing pressure on undeveloped land.
What are the requirements of credit SSc3 Redevelopment of Contaminated Sites?
Develop contaminated site plan and provide remediation as required by Provincial Contaminated Sites Program.
What is the intent of credit SSc4.1 Alt. Transportation: Public Transportation Access?
Reduce pollution and land development impacts from automobile use.
What are the requirements for SSc4.1 Alt Trans. Public Transportation Access
Locate building within 800m (0.5 miles) of a commuter rail, light rail, subway or 400m of 2 or more public bus lines.
What are the requirements for SSc4.2 Alt Trans. Bike storage & changing rooms?
Commercial:Secure bike storage, showers w/in 183m (200yds) for 5% of occupants. Res: Covered bike storage for 15% of occupants.
What is the intent of credit SSc4.3 Alt. Transportation: Alternate Fuel Vehicles?
Reduce pollution and land development impacts from automobile use.
What are the requirements of SSc4.3 Alt. Transportation: Alternate Fuel Vehicles?
Parking for hybrid/alt-fuel vehicles for 3% of occupants & preferred parking for these and high efficient vehicles OR alt-fuel refuling w/in 500m for 3% of total parking
What is the intent of credit SSc4.4 Alt. Transportation: Parking Capacity?
Reduce pollution and land development impacts from single occupancy vehicle use.
What are the requirements of SSc4.4 Alt. Transportation: Parking Capacity?
Parking capacity to meet but not exceed minimum zoning requirements and provide preferred/designated = to 10% of visitor stalls OR no new for rehab & preferred = to 10% of visitor stalls.
What is the intent of credit SSc5.1 Reduced Site Disturbance: Protect or Restore Open Space?
Conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity.
What are the requirements of credit SSc5.1 Reduced Site Disturbance: Protect or Restore Open Space?
Greenfield: Limit disturbance to 12m (40') building, 1.5m curbs, 7.5m pervious OR prev Dev'p restore min 50% of site area to native or adaptive veg.
What is the intent of credit SSc5.2 Reduced Site Disturbance: Development Footprint?
Conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity.
What are the requirements of credit SSc5.2 Reduced Site Disturbance: Development Footprint?
Exceed local zoning for open space by 25%. If no zoning, designate open space equal to building footprint.
What is the intent of credit SSc6.1 Stormwater Management: Rate & Quantity?
Limit disrutption and polution of natural water flows b managing stormwater runoff
What are the requirements of credit SSc6.1 Stormwater Managment: Rate & Quantity?
Impervious = <50% plan that prevents post dev. 1.5yr, 24hr peak disharge rate/quantity from exceeding pre-dev OR Impervious = >50% plan that reduces rate/quant. 25%
What is the intent of credit SSc6.2 Stormwater Management: Treatment?
Limit disruption of natural water flows by eliminating stormwater runoff, increasing on-site infiltration and eliminating contaminates.
What are the requirements of credit SSc6.2 Stormwater Managment: Treatment?
Remove 80% of TSS & 40% of TP by implementing BMPs CH4, PT2 (Urban Runoff) of EPA
What is the intent of credit SSc7.1 Heat Island Effect: Non-Roof?
Reduce heat islands (thermal gradiant differences) to minimize impact on microclimate and human and wildlife habitat.
What are the requirements of credit SSc7.1 Heat Island Effect: Non Roof?
Provide shade (w/in 5yrs) &/or light coloured &/or grid pavement for 30% of non-roof impervious or 50% parking u/g, or open-grid pavement for min 50% of parking lot
What is the intent of credit SSc7.2 Heat Island Effect: Roof?
Reduce heat islands (thermal gradiant differences) to minimize impact on microclimate and human and wildlife habitat.
What are the requirements of credit SSc7.2 Heat Island Effect: Roof?
ENERGY STAR high emissivity roofing (min 0.9) for min 75% of roof OR "green" roof for min 50% OR combo min 75%
What is the intent of credit SSc8 Light Pollution Reduction?
Eliminate light trespass from building and site, improve night sky access and reduce impact on nocturnal environments.
What are the requirements of credit SSc8 Light Pollution Reduction?
Meet IESNA RP-33-99 & Full Cutoff IESNA & candala value to fall within building/property & light 2.5x mounting hight from prop line shall be shielded.