66 Cards in this Set
- Front
- Back
What information should be provided as part of a CIR submission? |
Background Project Information |
|
How much does the CIR process cost? |
$220 each |
|
What is an individual who is working for a LEED® for Homes Provider and performs on-site inspections and testing for the LEED for Homes Rating System Called? |
Green Rater |
|
Which Rating Systems will award a project one or more points for already being LEED Certified in another rating system? (List 3) |
LEED for Homes LEED for C+I LEED for O+M |
|
Since CIRs are published what should CIRs not contain: |
drawings
AND
any confidential information about the project. |
|
What is CIR? |
Credit Interpretation Request
Precedent-setting rulings reviewed by USGBC on Formal Inquiries submitted by LEED project
A project can submit a CIR at any time
Submitted on LEED Online |
|
What is LEED? |
Leadership in Energy and Environmental Design
a US green building rating system
Provides 3rd party verification of claims through rigorous documentation & certification process |
|
Who is LEED Managed by? |
US Green Building Council (USGBC)
AND Green Building Certification Institute (GBCI) |
|
Triple Bottom Line |
environmental stewardship, social equity economic prosperity or people, planet, prosperity |
|
What are NOT basic services (diverse uses) |
parking lots police and fire stations liquor store hotels |
|
List 3 regulations likely contained in zoning regulations? |
Landscaping Regulations
Parking Space Requirements
Open Space Requirements |
|
What is the minimum project square footage required by the Minimum Program Requirements (MPRs) for projects using LEED BD+R, LEED ID+C and LEED O+M? |
1000 sqft |
|
What is the USGBC and what does it do? |
US Green Building Council
(content arm)
developing/refining LEED standards & Reference Guides |
|
What is the GBCI amd what does it do? |
Green Building Certification Institute
(Certifying and credentialing arm)
Runs LEED Bdg Certification & Pro Accreditation
|
|
List 3 LEED Accreditations |
LEED Green Associate LEED AP LEED Fellow |
|
LEED Green Associate |
Must be taken and passed first
|
|
LEED AP |
2nd tier;
in-depth understanding 1 of the 5 main rating system categories
gets name listed on USGBC.org LEED AP directory |
|
LEED Fellow |
Honorary Member of green building industry |
|
Name the 5 Rating system categories: |
[BD+C] Building Design + Construction [ID+C] Interior Design + Construction [O+M] Operations + Maintenance [Homes] [ND] Neighborhood Development
|
|
Use BD + C on 11 types of projects |
New Construction Major Renovation (50%< ssqft) Core + Shell (50%< leasable space) Schools, Healthcare, Hospitality Data Centers, Retail Warehouses and Distribution Centers
|
|
Predesign & Design Phase |
Building owner /owner’s rep: Sets goals and basis of design for energy performance, LEED certification |
|
Commissioning Authority (CxA) |
Leads and oversees commissioning (Cx) process to confirm that all building systems are appropriate & are installed and function properly |
|
Split Review of the BD + C certification application |
split review in two phases: 1. After the Design 2. After the Construction |
|
Which credits can be assessed early in the process |
site selection proximity to transportation
|
|
Which credits must wait until after construction to verify performance? |
construction waste management |
|
List the MPRs? |
Be a complete, permanent building or space
Use a reasonable site boundary
Comply with minimum floor area requirements (BD+C) 1000sqft (C+I) 250 sqft |
|
Transient Users
|
Occupants who do not use a facility on a consistent, regular, daily basis.
Ex: Students in educational settings, customers in retail settings, visitors in institute Delivery drivers |
|
MPRs |
The basic construction & development activities that the LEED program was designed to evaluate |
|
Full-time equivalent (FTE) |
A regular building occupant who spends 40 hours/week in the project building. Part-time or overtime occupants have FTE values based on their hours/week divided by 40 |
|
FTE building occupants |
A measure equal to the total number of hours all building occupants spend in the building during the peak 8-hour occupancy period divided by 8 hours (e.g. 10 part-time employees work 4 hrs/day + 10 FTEs work 8 hrs/day = 15 FTE building occupants) |
|
Commissioning |
The process of verifying and documenting that a building and all of its systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the owner’s project reqs. |
|
Basis of design |
Includes design information necessary to accomplish the owner’s project requirements, including system descriptions, indoor environmental quality criteria, design assumptions, & references to applicable codes, standards, regulations, & guidelines |
|
When to use Interior Design & Construction? |
Tenants who lease their space or do not occupy the entire building are eligible
Designed to work hand-in-hand with LEED for Core & Shell
|
|
When to use LEED Core & Shell? |
Developer controls the design and construction of the entire core and shell base building but has no control over the design and construction of the tenant fit-out.
Owner must occupy 50% or less of the building’s leasable square footage
|
|
When to use LEED O&M? |
Existing buildings new to LEED certification
Buildings previously certified under LEED for New Construction, LEED for Schools, or LEED for Core & Shell After one year of continuous operation |
|
When are performance period durations? |
Minimum is 3 months (12 month min) for energy performance credits
Maximum is 24 months
|
|
Occupant |
Workers who either have a permanent office or workstation in the building or typically spend a minimum of 10 hrs/week in the building. |
|
how to calculate FTE |
number of employees x hours per day/ 8 hours |
|
What is LEED Neighborhood Development (ND)? |
Integrates smart growth, new urbanism and green building
Emphasis on the site selection, design, and construction elements that bring buildings and infrastructure together into a neighborhood and its context |
|
What is LEED online? |
Electronic submittal form for submitting all LEED certification documents for final review |
|
What is a LEED Checklist? |
Excel-based checklist provides a snapshot of credits, performance levels, & associated points |
|
What is a project boundary? |
Building footprint + associated land supporting the building |
|
What are features to LEED Online |
first step in obtaining LEED Certification Use to assign team roles & access to LEED project Submit 100% of documentation Submit CIRs Communicate w/ reviewers Ultimately earn LEED certification
|
|
Can you submit a CIR at anytime? |
Yes |
|
What are the 4 LEED Rating and their score ranges? |
Certified: 40 - 49 Silver: 50 - 59 Gold: 60 - 79 Platinum: 80+ |
|
List all 8 of the Credit Categories. |
Location & Transportation Sustainable Sites Water Efficiency Energy & Atmosphere Materials & Resources Indoor Environmental Quality Innovation and Design Regional Priority |
|
What is the registration fee? |
Register the project in LEED Online and pay flat registration fee |
|
What is the certification fee based on? |
Certification fee is based on: rating system + SQFT of project. |
|
Before submitting a CIR what should the project team do first? |
Carefully review credit and reference guide before submitting |
|
Credit weightings are based on _____? |
Environmental aspects and human benefits |
|
What would be examples of a LEED credit that would have documentation submitted as part of the design submittal? |
Site Selection |
|
LEED for New Construction and Major Renovation would be the appropriate rating system for the following projects: |
An office renovation involving the replacement of the HVAC system
A new factory |
|
What are Benefits of green building design? |
Reduced energy costs Improved community relations Improved indoor Air Quality for future occupants
|
|
How many prerequisites are there for LEED BD+C New Construction? |
12 |
|
Which (5 of 8) credit categories have prerequisites for LEED BD+C New Construction? |
(SS): Sustainable Sites (WE): Water Efficiency (EA): Energy & Atmosphere (MR): Materials & Resources (IEQ): Indoor Environmental Quality
|
|
What is the (SS): Sustainable Sites prerequisite for LEED BD+C New Construction? |
(SS):Prerequisite: Construction Activity Pollution Prevention |
|
What are the (WE): Water Efficiency prerequisites for LEED BD+C New Construction? |
(WE): Prerequisites: Indoor Water Use Reduction Outdoor Water Use Reduction Building-level Water Metering
|
|
What is the (EA): Energy & Atmosphere prerequisites for LEED BD+C New Construction? |
(EA): Prerequisites: Fundamental Commissioning and Verification Minimum Energy Performance Building-level Energy Metering Fundamental Refrigerant Management
|
|
What is the (MR): Materials & Resources prerequisites for LEED BD+C New Construction? |
(MR): Prerequisites Storage & Collection of Recyclables Construction & Demolition Waste Mgmt Planning |
|
What is the (IEQ): Minimum Indoor Air Quality Performance prerequisites for LEED BD+C New Construction? |
(IEQ): Prerequisites Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control |
|
What is the first credit category |
Location and Transportation (LT) |
|
What are the next steps to be taken after a split design submittal and the LEED Reviewer responds with technical advice? |
Respond to the technical advice the LEED reviewer sent |
|
How should a project deal with initially registering itself as one building but now has been changed to 3 free standing structures? |
Call or Email LEED technical customer service |
|
The LEED boundary may not include other owner’s lands except when which of the following is true? |
The land is associated with and supports normal building operations for the LEED project building |
|
True or False, Pilot credits are only available to certain rating systems. |
True |
|
True or False, Planned uses do not count if they are available within one year of LEED occupancy. |
False. Planned used do count within 1 yr of LEED occupancy |