• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/24

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

24 Cards in this Set

  • Front
  • Back
What does LEED stand for?
Leadership in Energy and Environmental Design
When was LEED formed
LEED was formed of USGBC in 1993
What does USGBC stand for?
US Green Building Council
What is LEED Version 1? What year?
Pilot project, August 1998
When was LEED 2.0 released
March 2000
WHen was LEED Version 2.1 released
2002
When was LEED 2.2 released
2005
WHen was LEED 3.0 released?
May 2009
Emissivity
Emissivity is the ratio of the radiation emitted by a surface to the radiation emitted by a black body at the same temperature.
Densely Occupied Spaces
Densely Occupied Spaces
Densely occupied spaces are areas with a design occupant density of 25 people or more per 1,000 square feet (40 square feet or less per person).
12,000 sf of gross area
use 2000 sf as leasing
lease rest to tenants

Which system
LEED NC or LEED CS
LEED CS - owner or developer must occupy more than 50% of buildings leaseable area to seek LEED NC
Minimum Program Requirements: site ratio
higher than 2%
Minimum Program Requirements: minimum floor area by LEED

LEED NC, CS, Schools, O&M --- _______

LEED CI, Retail -- ____
1000 sf

250 sf
LEED CS project --
who has access to database after registration?
Can we avoid submitting post occupancy water and energy use?
Will credits be awarded at design submittal?
who has access to database after registration? - only Administrator
Can we avoid submitting post occupancy water and energy use? - must agree to this per MPR
Will credits be awarded at design submittal? - no credits at design submittal
LEED for Homes must contact a LEED contact from which organization
LEED for Homes provider organization
What do CIRs stand for?
Precertification is for which categories of LEED
What is a Green Rater?
How long before USGBC starts to review project after receiving submittal?
Credit Interpretation Rulings
All
Green Rater - professional who has shown qualifications to deal with home's energy systems
Start review in 10 working days
Which of following are not true?

a. Green buildings employ integrative approach
b. LEED project taeam may include, facilitis, owner and planning staff
c. LEED project team does not include product manufacturers
d. LEED project team does not include structural engineers
c, d
Which of the following normally happen at Construction Documents (CD) Phase of the project? (Choose 2)

MRc1: Building Reuse
MRc2: Construction Waste Management
MRc3: Materials Reuse
MRc4: Recycled Content
MRc2: Construction Waste Management
MRc3: Materials Reuse
LEED was formed of _____ in _____
USGBC in 1993
Leed Version 1.0 launched in (month, year)
August, 1998
LEED version 2.0 launched in (month, year)
March 2000
Leed version 2.1 launched in (year)
2002
Leed version 2.2 launched in (year)
2005
LEED 3.0 launched in (month, year)
May 2009