Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
24 Cards in this Set
- Front
- Back
What does LEED stand for?
|
Leadership in Energy and Environmental Design
|
|
When was LEED formed
|
LEED was formed of USGBC in 1993
|
|
What does USGBC stand for?
|
US Green Building Council
|
|
What is LEED Version 1? What year?
|
Pilot project, August 1998
|
|
When was LEED 2.0 released
|
March 2000
|
|
WHen was LEED Version 2.1 released
|
2002
|
|
When was LEED 2.2 released
|
2005
|
|
WHen was LEED 3.0 released?
|
May 2009
|
|
Emissivity
|
Emissivity is the ratio of the radiation emitted by a surface to the radiation emitted by a black body at the same temperature.
|
|
Densely Occupied Spaces
|
Densely Occupied Spaces
Densely occupied spaces are areas with a design occupant density of 25 people or more per 1,000 square feet (40 square feet or less per person). |
|
12,000 sf of gross area
use 2000 sf as leasing lease rest to tenants Which system LEED NC or LEED CS |
LEED CS - owner or developer must occupy more than 50% of buildings leaseable area to seek LEED NC
|
|
Minimum Program Requirements: site ratio
|
higher than 2%
|
|
Minimum Program Requirements: minimum floor area by LEED
LEED NC, CS, Schools, O&M --- _______ LEED CI, Retail -- ____ |
1000 sf
250 sf |
|
LEED CS project --
who has access to database after registration? Can we avoid submitting post occupancy water and energy use? Will credits be awarded at design submittal? |
who has access to database after registration? - only Administrator
Can we avoid submitting post occupancy water and energy use? - must agree to this per MPR Will credits be awarded at design submittal? - no credits at design submittal |
|
LEED for Homes must contact a LEED contact from which organization
|
LEED for Homes provider organization
|
|
What do CIRs stand for?
Precertification is for which categories of LEED What is a Green Rater? How long before USGBC starts to review project after receiving submittal? |
Credit Interpretation Rulings
All Green Rater - professional who has shown qualifications to deal with home's energy systems Start review in 10 working days |
|
Which of following are not true?
a. Green buildings employ integrative approach b. LEED project taeam may include, facilitis, owner and planning staff c. LEED project team does not include product manufacturers d. LEED project team does not include structural engineers |
c, d
|
|
Which of the following normally happen at Construction Documents (CD) Phase of the project? (Choose 2)
MRc1: Building Reuse MRc2: Construction Waste Management MRc3: Materials Reuse MRc4: Recycled Content |
MRc2: Construction Waste Management
MRc3: Materials Reuse |
|
LEED was formed of _____ in _____
|
USGBC in 1993
|
|
Leed Version 1.0 launched in (month, year)
|
August, 1998
|
|
LEED version 2.0 launched in (month, year)
|
March 2000
|
|
Leed version 2.1 launched in (year)
|
2002
|
|
Leed version 2.2 launched in (year)
|
2005
|
|
LEED 3.0 launched in (month, year)
|
May 2009
|