• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/18

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

18 Cards in this Set

  • Front
  • Back
WE 1.1 Water Efficient Landscaping: Reduce by 50%


What is Intent
Limit or eliminate the use of potable water, or other natural surface or subsurface water resources near or on project, for irrigation.
WE 1.1 Water Efficient Landscaping: Reduce by 50%


What are requirements?
Reduce potable water concumption for irrigation by 50% using:

Landscape coefficent (Kl)
Irrigations effieciency (IE)
Project specifice evapotranspiration (ETL)
Use of Captured rainwater
Use of recycled wastewater
Use of water treated & conveyed by a public agency soecifically for non-potable uses
WE 1.2 Water Efficient Landscaping: No Potable Water Use or No Irrigation


Requirements?
No Potable water use
AND
Use only captured water, recycled wastewater, recy. graywater, or water treated for special use of irrigation
OR
Install landscaping that doesn't require perm. irrigation
WE 1.1-1.2 Water Efficent Landscaping

Technolgies and Strategies?
*Perform Soil/climate analysis to determine native/adapted plants to use.
*Use high efficecy irigation stategies
*Use drip systems (30-50% less water than sprinklers)
WE 1.1-1.2 Water Efficent Landscaping


Submittals?
The projects calculated baseline Total Water Applied (TWA) (gal.)

Baseline Case TWA (gal) = Area (Sf) X (ET(in/IE) X .6233 gal/sf/in.
WE 2 Innovative Wastewater Technologies


Intent?
Reduce generation of wastewater and potable water demand,while increasing the local aquifer recharge
WE 2 Innovative Wastewater Technologies


Requirements - Option 1?
Reduce potable water use for building sewage conveyance by 50%. (water conserving plumb. fixtures, urinal, captured rainwater, graywater)
WE 2 Innovative Wastewater Technologies


Requirements - Option 2?
Treat 50% of wastewater on site to teriary standards AND
Treated water must be infiltrated or used-on-site
WE 2 Innovative Wastewater Technologies


Exemplary Performance
*Zero Use f potable water in sewage conveyance

*100% on-site treatment and reuse/infiltration of wastewater
WE 2 Innovative Wastewater Technologies


Technologies and Strategies?
*Specfy. high effiency fixures, dry fixtures (composting toilets)
*Reuse sotrmwater or graywater
*Options for w.w. treatment incl. Packaged biological nutrient removal, constructed wetlands, h.effc. filtration systms.
WE 2 Innovative Wastewater Technologies


Submittls? Basic Assumption1?
*Plumb. Construct. dwgs
*Calc. Basic Assumption
Female 1: Male 1 or
Project specific ratio
Gallon per flush (GPF)
WClost 1.6, Urinal 1.0

Daily use:
WC male: 1
Urinal male: 2
Wcloset female: 3
WE 2 Innovative Wastewater Technologies

Submittals.continued
Calculation: Basic Assump.2?
Fixture GPF
Conv. WCloset 1.6
Low flow Wcloset: 1.1
Ultra low flow Wcloset: 0.8
Compst. toilet: 0.0
Conv. Urinal: 1.0
Waterless Urinal: 0.0
WE 2 Innovative Wastewater Technologies

Submittals.continued
3 equations: Basic Assump.2?
Eq. 1 Sewage colume (gal) = Uses x Duration (flushes/min.) xWater volume/Use (flush/min.)

or Eq. 2 Daily sewage generation (gal)= Male occupants x male Sewage Generation (Gal) + Female occupants x Female Seage Generation (gal)
WE 3 Water Use Reduction


Intent? Ref. Stndrd?
Maximize water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems.

Ref: Energy Policy Act (EPAct) of 1992 -- Deals with Water!!!
WE 3.1 Water Use Reduction: 20% reduction


Requirements?
Employ strategies that in aggregate use 20% less water then the water use baseline for the bldg. after meeting EPAct fixt. perf. requmnts.

-Don't include Irrigation
-include: Wclosets, urinals, lavoratory faucets, showers, kitchen sinks.
WE 3.2 Water Use Reduction: 30% reduction


Requirements?
Employ strategies that in aggregate use 30% less water then the water use baseline for the bldg. after meeting EPAct fixt. perf. requmnts.

-Don't include Irrigation
-include: Wclosets, urinals, lavoratory faucets, showers, kitchen sinks.
WE 3.2 Water Use Reduction: 30% reduction


Exempllary Performance
Reduce water consumptin by at least 40%

OR Ptable water use reduction in process and non-regulated water consuming fixtures by at least 10%.
WE 3.2 Water Use Reduction: 30% reduction


Submittals?
*Number of Bldg. Occupants
*Project design case
*Project claculated baseline
*Non-potable water use
*Narrative