• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back
5 Whys
Process of continuing questioning the process

to think deeper into the problem
Muda, Mura, Muri
Muda - Waste
Mura - Uneveness - irregular work flow
Muri - Overburdened
Shigeo Shingo
Toyota Leading expert on manufacturing
invented Poka-yoke
and SMED
SIX Sigma Belt Certification
belt certficictions for Six sigmas relevant skill level
Heijunka
technigue for reducing waste in production by evening output flow
5 s
Sort
Straighten
Shine
Standardize
Sustain