• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back

Formula for TCT theo. Cycle time

TAW/TO=time available for work/theo. Output


Answer is in seconds per unit


**make sure to times hours by 3600 cuz 3600 seconds in an hour

Formula for theo min # of workstations TWS

TWS=TTT/TCT


= total time or sum of time for all activities/ theo cycle time

What are servicescapes

Physical surroundings in which service is delivered

Movement cost per day- how to calculate

Load times cost per load to transport

Formula for cycle time

TAW/OUTPUT


Production time available per day / units required per day

Formula for min number of workstations

TTT/CT



Sum of time for tasks / cycle time