13 Cards in this Set

  • Front
  • Back
- to reduce setup time, attention must be focused in three areas:
the setup process, the equipment, and the workers
internal setup activities
activities that can only be performed while the equipment is stopped
External setup activities
manufacturing activities that can be performed while the equipment is operating
when designing setup procedures, one should try to get as much activity into the external category as possible because?
this will minimize the amount of time that the equipment must be shut down
one touch setups
(takes less than one minute to perform)
single setups
(takes a single digit, in minutes, to perform)
Push system
When production is done prior to knowing demand
Pull System
When produced based on demand
Flow control?
flow is controlled by simple visual systems (like kanban cards, colored flags, colored lights, etc
Role of workers in JIT
- performing maintenance activities on the equipment so that it will be in a state capable of producing conforming output when the next small batch is called for
- performing housekeeping duties in the work area so debris and clutter are removed, thereby reducing the chances of nonconforming output when the next batch is produced
- performing quality assurance and quality control assessments on the items produced
- operating other pieces of equipment, making other parts for other user work centers (this is the notion of flexible, cross-trained workers)
- identifying and solving problems in the work area
parameters for working with external suppliers in JIT systems
fewer suppliers a particular item (with the goal of single-source suppliers)
- suppliers selected not on the basis of price, but on the basis of quality and delivery reliability
- long-term contracts established with suppliers
- cooperative relationships established with suppliers (cost and information sharing)
- suppliers locate near customer (resulting in quicker deliveries)
- stable delivery schedules maintained (see uniform plant loading later)
what the process of uniform plant loading (or mixed model sequencing) is all about____________
keepING inventories low, and to produce in a pattern that is more closely aligned to the demand pattern
various benefits of a JIT system
- reduction in inventory
- improved quality
- reduced space requirements
- shorter lead times
- lower production costs
- increased productivity
- increased machine utilization
- increased workforce flexibility
- greater output volume flexibility