The first province to enact boiler and pressure vessel legislation was |
Quebec |
|
A body which was formed in 1919 for the promotion of safety and uniformity in the construction, installation, and inspection of boilers and pressure vessels was the |
National board of boilers and pressure vessel inspectors |
|
The purpose of the safety codes act and engineers regulation is to |
ensure safe installation and operation of a power plant |
|
The main purpose of the safety codes act is |
The promotion of safety of life and property |
|
The act and regulation do not apply to |
A power plant having a boiler rating of 10kW or less |
|
The code that regulates mechanical refrigeration is |
CSA B-52 |
|
Relative to boilers and pressure vessels, a code which has not been adopted by all the provinces is |
NFPA |
|
When a fitting is to be registered within a jurisdiction |
An application must be made to the chief inspector |
|
The province of alberta currently has a various certificates of competency relative to power engineering and boiler operation, the number being |
8 |
|
Once you have taken over a shift in a high pressure boiler plant, you may leave the boiler unattended for |
No period of time |
|
The principal reason you should keep a boiler plant log book or log sheet is to |
Provide a record of boiler operation and maintenance |
|
A fourth class engineer certificate of competency qualifies the holder to take charge of a power plant not exceeding |
1000kW |
|
A fitting as defined in the act means |
A gauge glass |
|
After an initial inspection of a boiler or pressure vessel, an Alberta identification number preceded by the letter "A" in a ________, shal be stamped on the boiler or pressure vessel. |
Circle |
|
A candidate for a welders performance qualification card |
Must first pass a performance qualification test |
|
a welder performance qualification test |
Must be completed before the welder obtains his or her performance qualification card. |
|
when applying to write a certificate of qualification examination the candidate, when applicable, may have to |
Be in possession of the next lower class certificate |
|
Expected conduct during an examination for a certificate of the competency is stated in |
The Engineers regulations of alberta |
|
Definitions such as shift engineer, and fireman are found in |
Alberta's engineers regulations |
|
Heating boiler means |
a boiler where steam is produced at a pressure of 103kPa or less |
|
R-11 refridgerant belongs to the following group of refrigerants : |
Group A1 |