3 ways of dealing with poor soil/ improving soil?.
|
.Deep foundations
Removal and replacement Consolidating (improve properties in place) |
|
.Method of ground improvement only practicable above water table and in shallow depths
|
.Removal and replacement
|
|
.Soil improvement approaches
|
.Densification- consolidation, compaction
Adding a foreign material- to fill voids and reinforce the soil |
|
.4 methods of ground improvement via densification (opposed to adding foreign material) in the form of consolidation (other densification method is compaction)
|
.preloading/precompression
pre loading with vertical drains Vacuum preloading Electro-osmosis consolidation |
|
.4 methods of ground improvement densification by compaction
|
.Shallow compaction
Dynamic/Impact compaction (BOOM from crane) Depth vibrator compaction / vibroflotation Vibro-replacement; stone columns |
|
.Main disadvantage of precompression/preloading?
|
.surcharge ust stay in place for very long time! thus delaying construction
|
|
.The main advantage of precompression/preloading with vertical drains?
|
.Consolidation reduced to couple of months instead of years!
|
|
.... compaction is effective
if silt content is less than 12-15% and clay is less than 3% |
.Vibratory probe
|
|
.... extends the range of soils that can be
improved by vibratory techniques to include cohesive soils. |
.Vibratory replacement
|
|
.... is a PVC or metal pipe
in which rubber sleeves cover holes that are drilled in the pipe at specific intervals |
.manchette grouting tube
|
|
.... A two-phase internal fluid system with a coaxial air-jet
|
.double fluid jet grouting
|
|
.... SOIL NAILING
|
.SOIL NAILING
|
|
....can be used to wrap compacted layers of soil ultimately
producing a stable composite structure |
.Geogrids or geotextiles
|
|
.
|
.
|