• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back

Where is your case study

The river Nene



Where is the river Nene

Northampton

What happened on 9th April 1998

River flooded flooding parts of Northampton.

2 people died.


Caused the decision to manage the river Nene



By 2002 how much had the environment agency invested

6.8 million


What happened in 2003 & 2007

Further defence work


Weldon

in 2002 a 450m clay flood embankment was built. This raised the level of the land to 6.8 metres

Cost 2 million





Upton Square

New housing estate above the level of flood plain


Possible due to management of the river

Billing

Flood retention reservoir built


Upton

River channel capacity increase by building embankments 10m from the river


Northampton

2003 warning system was upgraded

Aims 2 give two hours notice of floods.


Flood season Awareness campaign put into place