Discuss term ORM
|
1. Decision making tool used by people at all levels to increase operationl affectiveness by anticipating hazards / reducing potential for loss
2. Increases our ability to make informed decisions. 3 Minimizes risks to acceptable levels. ORM provides reduces mishaps, lower costs, effiecient use of resources. |
|
5 Step ORM Process
|
IAMIS Implement Controls Supervise |
|
4 Principles of ORM
|
AAA M
Accept risk when benefit outweighs cost Accept no unnecessary risk Anticipate and manage risk by planning Make risk Decision at the right level |
|
Head Protection
|
Safety Helemts / Kevlar
|
|
Hear Protection
|
Used in areas where noise is greater than 84 decibles. 140 peak sound pressure or greater.
84-104 single protection 104 + double protection
all personel exposed to gunfire, artillary, mortar, or missile firing. |
|
Foot Protection
|
All personel exposed to foot hazards. construction, maintenance, transportation, weapons, supply, warehouse.
|
|
Hazardous Material
|
Any material, becuase of it's "make-up" may poase as a hazard to humans or the environment.
|
|
Hazardous Waste
|
discarded hazardous material designated as hazardous waste by the EPA or State authorities.
|
|
MSDS
|
Technical bulletin (binder) containing information on material:
composition, characteristics, safety hazards, precautions for use and handling.
All personel are trained on any hazards they are exposed too. |
|
Hazard
|
condition of potentional injury/death, damage to property, or mission degradation.
|
|
Risk
|
Expression of possible loss in terms of Severity and probability.
|
|
Risk Assessment
|
process of detecting hazards and assessing associated risks.
|
|