• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/8

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

8 Cards in this Set

  • Front
  • Back

What is the formal process for managing risk?

ORM

Ergronomics

Science and study of how the human body interacts with work center environments

What does PPE stand for

Personal protective equipment

What are 3 mishap classifications w/description

Class a - total damage 2m + aircraft destroyed or fatality permanent damage


Class b - total damage 500k to 2m injury or illness resulting in partial disability with three or more injured


Class c - total damage 50k to 500k one or more days away from work for one or more DoD personnel

Name the 4 principles of ORM

Accept risk when benefit outweighs the cost


Accept no unnecessary risk


Anticipate and manage risk by planning


Make risk decisions at the appropriate level

On the risk assessment matrix what two categories are used to determine a risk assessment code

Probability and severity

How many risk assessment codes are there?

5


1: critical


2: serious


3: moderate


4: minor


5: negligible

The key principle of ORM follow up is what?

Supervising