• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/23

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

23 Cards in this Set

  • Front
  • Back
_______is a skill required by all managers

Planning

______involves a significant amount of time and effort

Planning

Planning forms a base for__________needs and______visions

short-term; long-term

______entails a process of determining the appropriate allocation of precious resources to ensure success of a facility

Planning

The two ways in which planning can be accomplished are_______and_______

A group of people (a gang in a room---AGIR)




Authoritarian technique (one man on a mountain----OMOM)

Facility planning for_______entails planning for all events to be held in the facility and then monitoring all events to determine what changes need to be made in the future

Existing facilities

The 4 areas of concern when planning a facility are_______

Money


Personnel


Scheduling


Space Management

4 important questions to ask when planning a facility are_______

Who wants the facility?


What facility do they want and why?


What will meet the greatest current or future needs?


What will cause the least amount of financial harm or inconvenience?

The first step in the planning process is to analyze existing_______and_______constituents

Internal; External

Additional steps in the planning process:

-Conduct a feasibility study


-Develop a potential budget


-Organize various planning committees


-Set realistic goals and objectives


-Study political and financial marketplace


-Generate community support


-Bring in the right people before the project starts

The different types of sports facilities to consider are_______

-Stadiums


-Arenas


-Gyms


-Community sport centers


-Sportsplexes


-Domes


-Golf courses


-Water parks

After examining what type of facility to build, the next step is to_____

Examine potential site plan and business plan

The planning process entails the following:

-Running the day-to-day operations of the facility


-Examining what type of facility will meet a given need or objective and working out the justification for building or leasing


-Determining what facility to build or lease and justifying the need for the facility

What daily events at a stadium do you think you need to plan for one day in advance, one month in advance, and one year in advance?

1 day:


1 month:


1 year:

What steps would you take to convince residents that a large sport facility is a good thing to build near their homes, and what could be their objections?

Why is it good?


Objections?

Who should be on the planning committee to build a minor-league baseball stadium?

Who?

The 7 things to consider when deciding on a site location are_______?

1) Detailed geography (soil, subsoil, vegetation)


2) Environmental concerns


3) Population composite (demographics of area)


4) Constituency representation (political clout)


5) Flood area (drainage, runoff)


6) Climate, precipitation, winds, natural disaster strikes (hurricane paths, tornadoes, earthquakes, floods)


7) Capital improvement plan maps (illustrating current and planned projects by council district

soil, subsoil, vegetation

detailed geography

demographics of area

population composite

political clout

constituency representation

hurricane paths, tornadoes, earthquakes, floods

natural disaster strikes

illustrating current and planned projects by council district

Capital improvement plan maps

d

d