• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/18

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

18 Cards in this Set

  • Front
  • Back
C7 C
Cycle time
C7 r
desired output rate
C7 ET
Total assemble time
C7 N
Number of X
C8 K
Number of (containers)
C8 d
expected daily demand
C8 p
Average processing time
C8 C
Quantity in a standard container
C8 Alpha
saftey stock for the unexpected
C9 Q
Total
C9 Dl
Demand during lead time
C9 C
cycle time
C9 H
Cost of holding
C9 D
Annual demand
c9 s
cost of ordering
C9 OH
O N HAND DELIVERY
c9 sr
Scheduled reciepts
C9 BO
Back orders