• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/29

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

29 Cards in this Set

  • Front
  • Back

Boilers

2 600psi D type


In fire room

Superheater

Heats steam above saturation temp 750-875*

Economizer

Feed water first enters boiler, increases feed water temp 100-200*, one per boiler

Downcomers

Largest tube in boiler, takes boiler water from the steam drum

Furnace

Where the fuel is burned to produce heat

Soot blowers

7 per boiler

Black smoke

Too much fuel


2min to shut off boiler

White smoke

Too much air


1min to shut off boiler

Steam drum

Where feed water enters, steam exits it and goes to the superheat

Forced draft blowers

6 total


3 per boiler


2 steam driven


1 electrical


For start up of boiler, 600psig

Main feed pump

2 turbine pumps


To increase pressure to 800psi

Main feed booster pumps

3


Pumps water to main feed pump

DFT

De-aerating feed tank (stores feed water, maintained at 15psi 250*

Four parts of the shaft

Thrust


Line


Tail


Stern tube

Main air ejector

Removes air from main condenser, helps maintain a vacuum on main condenser

Main condenser

Contains 2000-1000 tubed


Condenses steam using seawater

Distilling plants

Two 6 stage flash type


50,000 gallons of water per day

SSTG

Ships service turbine generators


4 in engine room, capacity 1200rpm, 4009amps, 2500kw, 450v

Emergency diesel generator

Fairbanks morris 38nd 8 cylinder 16 piston opposed pistons


1000kw, 1604amps, 440v, F76

Air start/assist

Used to turn over the engine during start up

HPAC

Three


3000psig


Ships whistle, dive chamber, SCBA refill, Edg air flask

LPAC

Three


115-125psig


Pneumatic tools

HP turbine

Single pass, ahead engine, runs off main steam 600psig

LP turbine

Duel pass, astern engine

Main reduction gear

High speed low torque to low speed high torque, turns the shaft to move the ship

A/C units

3 250ton centrifugal compressor units

Refer units

3 8ton reciprocating compressor units

Four phases of the ac&r cycle

Compression, condensation, expansion, evaporation

How to steer the ship

Helm


Trick wheel


Hand pump