• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back
STEP 1
Pass the mirror and explorer to the dentist and then pass a 2x2 gauze to dry the muccobuccal fold and the topical anesthetic. Pass the anesthetic syringe.. Use 3way and HVE
STEP 2
Place rubber dam.. Inform patient on the dam and see if any there are any questions or concerns
STEP 3
Dentist creates and opening... Stay out of the dentist line of vision
STEP 4
Rinse area quickly after dentist uses handpiece
STEP 5
May use spoon excavator or explorer...
STEP 6
Passes a barbed broach.. more if needed
STEP 7
Pass a #10 or #15 reamer with stoppers to measure the length of each canal.. Expose radiograph
STEP 8
Pass additional files in progression until the proper width and length of the canal are achieved.
STEP 9
Pass the irrigating syringe with irrigating solution to the dentist.. Keep the HVE close to the tooth so the irrigating solution is effciently aspirated and not allowed to splash the patient or the dental team
STEP 10
Pass paper points with locking cotton pliers and continues to pass paper points until the canal are completely dry
STEP 11
Pass a small cotton pellet containing medication to the dentist who places it in the tooth..
STEP 12
Gutta percha point is selected that matches the width size of the last file used in each canal. Assistant exposes a radiograph to verify the proper lenght and seal
STEP 13
Mix the endodontic sealer to a creamy consistency and passes it to the dentist, so he can coat the tip of the master gutta percha point.
STEP 14
Pass the endodontic spreader and additional accessory gutta percha points and continues to pass the spreader and an additional point until each is full
STEP 15
Pass the endodontic condenser and prepares the torch. Holds 2x2 gauze squares and holds the HVE tip close to the tooth
STEP 16
Ensure that the HVE tip aspirates any smoke and receives the melted gutta percha from the dentist with a 2x2 gauze
STEP 17
Prepares the temporary filling material and passes the Woodson... Dentist places the filling, pass a lightly dampened cotton applicator to the dentist, who uses it to smooth the temporary restoration.
STEP 18
Uses the HVE and 3way to ensure that the rubber damn is rinsed free of debris.. Dam is removed and the dental assistant freshens the patients mouth by rinsing and aspirating
STEP 19
Dries the tooth and passes the articulating paper to the dentist who will ask the patient to lightly tap the teeth together.
STEP 20
Exposes a final radiograph and provides postoperative instructions to the patient..