• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/64

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

64 Cards in this Set

  • Front
  • Back

Sources of AC Power

- 2 IDGs


- APU Gen


- AC GPU


- 1 Inverter 250V


- Ram Air Turbine

How many IDGs are required to power both Buses?

1 on ground and in flight

APU can power both AC Buses

-On ground


-In flight up to FL 330

When can GPU power both AC Buses?

On ground ONLY

Primary source of AC power?

IDGs

IDG Switch "AUTO"

System logic controls the contactor

IDG Switch "OFF"

Opens Contactor

IDG Switch "DISC"

Mechanically disconnects the constant speed drive (CSD) from the IDG.



Must be held for one second

Amber LED light next to IDG switch

HOTLOP condition



Oil Pressure drops below 140 +/- 25psi, or



Oil Temp reaches 335F

Can you reconnect IDG in flight?

No

Secondary source of AC power?

APU


AC GPU

What powers the APU's FADEC?

BATT 1

What powers the APU START BUS?

BATT 2

What power sources are required for APU Start?

BATT 1 and 2



or



Batt 1 and DC GPU

Minimum Battery voltage for APU start?

21V

Minimum Battery Temperature for APU start?

-20 C

AC GPU may be turned on...

Button locations...



1. AC GPU panel (pwrs only ground service bus)


2. Opposite the FWD lav (pwrs only gnd svc bus)


3. Cockpit overhead panel

Normal AC Electrical Priority

- Onside (IDG)


- Inside (APU)


- Outside (GPU)


- Cross-Side (Other IDG)

What does the onboard inverter power?

AC STANDBY BUS when normal AC power source is not available so the "A" igniters always have a source of power.

Ram Air Turbine (RAT)

Automatically deploys if both AC buses lose power during flight

Emergency AC power source?

RAT

Maximum Altitude and speed for RAT deployment?

There is no max alt or speed for deployment

What does the RAT power?

AC ESS BUS



(DC ESS BUS powered through the ESS TRU)

Minimum speed for RAT?

130kts

What happens when RAT is deployed and speed is below 130kts?

Load shedding.



The RAT will only power the AC ESS BUS.



BATTS will provide the AC STBY BUS (through inverter) and DC ESS BUS

During RAT deployment (as it happens), What provides power?

The aircraft batteries

DC Electrical Power

- 3 TRUs


- 2 NiCd Batteries


- DC GPU

Primary source of DC power?

3 TRUs



Each work in isolation to each other

Secondary source of DC power?

- Batteries


- DC GPU

How are the batteries charged?

Constantly charged through an AC source through the TRUs, including the AC GPU and the RAT.

How long will the batteries provide power?

10 minutes

Minimum voltage required to close the battery contactor?

18.0V

What can replace BATT 2 for APU Start?

DC GPU

How is DC GPU turned on?

May only be turned on by a ground ramp button

Electrical Power Distribution

- 4 ICCs


- 2 SPDAs

Integrate Control Center (ICC)

Basically, the ICCs collect and confirm the power is safe and then sends it to the SPDAs, which distributes it.



AOM II 14-05-20 for more info

Secondary Power Distribution Assemblies (SPDA)

An electrical load management unit that receives power from the ICCs and distributes it to the a/c systems via system logic.

Thermal Circuit breakers are located in..

- cockpit side panels


- ICCs

Which remote circuit breakers require MTC action?

Ones located in the ICCs.



SPDA remotes are electric and may be reset through the MCDU

Where are electric circuit breakers located?

SPDAs

DC HOT BUS 1 Items...

-Engine 1A/2A fire extinguisher


-Engine Fuel Shutoff Valve 1


-Hydraulic Shutoff Valve 1


-Eng 1 Oil level indication


-Courtesy/Svc lights


-DC ceiling lights


-Water and waste system

DC HOT BUS 2 Items...

-Eng 1b/2b Fire Extinguisher


-Eng fuel shutoff valve 2


-Hydraulic shutoff valve 2


-Engine 2 oil level indication


-CMC


-Panel Refuel

How many networks make up the electrical system? Why?

2



Redundancy

What happens if a power generating source fails.

Bus ties automatically connect to provide no system degredation

What monitors and controls the IDGs?

Each one has a generator control unit (GCU)

How long after deployment until the RAT supplies power?

8 Seconds

When is the RAT displayed on the Electrical Synoptic Page?

When deployed.

Automatic IDG disonnect Temperature?

366F

APU Gen Button - Pushed IN

Automatic operation



This is the normal position

APU Gen Button - Pushed OUT

Opens APU Gen contactor and isolates the APU Gen from the AC BUS TIE

AC GPU "AVAIL"

AC GPU connected and quality requirements are satisfied

AC GPU "IN USE"

AC GPU is powering the AC electrical System

How is the RAT anti-iced?

It isn't, so make sure you exit and avoid icing conditions if possible.

Where does the CSD get its oil?

It has a separate oil supply and cooler.

Describe the Batteries

-Two


-NiCad


-22.8 VDC, 27A


-Used for power up and as a backup for the DC ESS electrical system

When is BATT 1(2) OVERTEMP indication triggered?

whenever the battery temp reaches 70C for at least 2 seconds.

LICC and RICC provide...

AC and DC output

AICC provides

DC output only

EICC provides

AC and DC output.

What items are load shed if one AC power source fails?

-Right windshield heating


-Galleys

What items are in the Forward Electronic Bay?

- Rat gen control


- SPDA


- EICC


- BATT 1


- Static Inverter

What items are in the Center Electronics bay?

- Left ICC


- Right ICC

What items are in the Aft Electronics Bay?

- APU Gen


- AICC


- BATT 2

What items are on the AC ESS BUS?

- AC fuel pump 2A


- ACMP 3A


- SF-ACE 1 FLAP CH 1 AC FEED


- SF-ACE 2 SLAT CH 2 AC FEED