Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
6 Cards in this Set
- Front
- Back
What are the procedures for correcting a spillage?
|
1. Contain the spillage.
2. Eradicate affected material 3. Recovery and follow up |
|
What are the types of COMSEC incidents?
|
Personnel
Cryptographic Physical |
|
What are the two types of PDS?
|
Reportable
Non Reportable |
|
How often are COMSEC inspections required?
|
Every 24 months
|
|
How often are CMS Advise and Assist visits required?
|
90 days prior to inspection
|
|
How often is the CO required to conduct a CMS inspection?
|
Quarterly
|