50 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

What year did the eu first decide eia was necessary

1985

How long did the eu give member states to comply with eia legislation

3 years

When did ireland begin to comply with eia legislation

1988

Who made the new sewer system

Bazalgette (1858-1874)

Og eia

Technical Feasibility Studies

What came after technical feasibility studies?

Cost benefit analysis

Who did eia first and when

America, 1970

Why did America institute eia

Santa Barbara oil spill

What act did america enact in regards to eia

NEPA 1969


National Environmental Policy Act

Who had to comply with NEPA

Major federal actions

When did the eu first start action programme about the environment

1973

Why eia required

To satisfy legislation

Underlying reason for eia

Management tool to ensure environmentally sound (sustainable) development

Players in eia process (4)

Environmental consultant


Concerned public


Competent authority


Proponent/developer

Stages of EIA (6)

Screening


Scoping


Study


Report (EIAR)


Review


Implementation

Screening

Attempts to rationalise the need for eia

Factors pointing towards need for EIA (3)

Nature and scale of development/proposal


Environmental setting


Likely degree of public concern/opposition

Screening methods (5)

Pos/neg lists


Project criteria (thresholds)


Sensitive area criteria


Matrices


IEE Initial Environmental Eval

IEE

Initial Environmental Evaluation

Scoping objectives (6)

Identify key concerns


Opportunity for public involvement


Save time and resources


Preps for EIAR


Better focused and streamlined EIA

Databases for desk study (6)

EPA


Copernicus


National land cover


National biodiv data centre


National parks n wildlife service


Atlases

Three guidelines for baseline studies

relevant


sufficient


credible

Components of the Environment (3)

population and human health


biodiversity


land, soil, water, air, and climate


material assets, cultural heritage and the landscape

Leopold matrix strength (5)

structure


no overlook


visual


can expand or contract


can be applied at diff temporal stages

Leopold matrix weaknesses (8)

too big


black n white


double counting


no short vs long term


too detailed for some, not enough for others


subjective


biased


no public

Tools for Impact Identification, Prediction, and Assessment (5)

matrices


checklists


overlays


networks (causal chain analysis)


env eval sys


wind farm name

derrybrien

How much did we need to pay cause of the wind farm

20,510,000

mitigation measures (4)

Avoidance


reduction


remedy


abandon

avoidance (2)

alt design, alt siting

Reduction (2)

minimise cause, minimise exposure

Remedy (3)


Restoration


Relocation


Replacement

Mitigation heirarchy (7)

Hi


Hi


Hi


Hi


Hi


Hi


Hi


Hi


Hi


Hi


Hi


Hi


Hi


Hi

avoidance of impact at source


reduction of impact at source (eg.waste reduction)


reduction of impact on site (eg.waste treatment)


reduction of impact at site of impact remedy of impact


compensation in kind


other compensation

Info needed by decision makers (5)

context- Whereexactly is it?


character- Whatdoes it look like?


significance- Is itunique? ……protected?


sensitivity- Is itlikely to be effected?


sufficiency of data- Is the information complete/reliable?

Four aspects of impact

Charachter


Magnitude


Duration


Consequence

EIAR formats

direct and grouped

Why public lack confidence in EIA

close association with developer


never hear of anything stopping due to EIAR

How many EIARs have been produced

3k-3.5k

SEA

Strategic Environmental Assessment

PPP

policy, plan or programme

Three types of PPP

SECTORAL (eg. Transport, Mining, Agri,Power)


SPATIAL (eg. Local, Regional, National)


INDIRECT (eg. Education, R&D, Tourism)

Who used SEA before EU

USA


Netherlands

When was the SEA directve announced

2001

What timespan were all the EIA directives

1985-2014

When were the birds directives

1979-2009

When was the habitats directive

1992

SPA

special protection areas- birds

SAC

Special areas of conservation-habitats

IROPI

imperative reasons of overriding public interest

Where was the appropriate assessment lake

Roscommon