• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/166

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

166 Cards in this Set

  • Front
  • Back
EQ c3.1- Construction IAQ Management Plan-: During Construction: The IAQ Management Plan requires following what standards?
SMACNA IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3.
EQ c1- Outdoor Air Delivery Monitoring: Is this a design or construction submittal?
Design
EQ c1- Outdoor Air Delivery Monitoring: What information should be provided for the CO2 Monitoring System?
1. Qty and location of monitors 2. Operational Parameters AND 3. Setpoints
EQ c1- Outdoor Air Delivery Monitoring: What should be included with the submittal documents?
1. Confirm Vent System Type & installed controls 2. Narrative of Ventilation Design & CO2 monitoring system 3. Drawings documenting location & type of sensors installed AND natural ventilation components.
EQ Credit 1: Outdoor Air Delivery Monitoring: What are the two requirements for mechanically ventilated spaces?
1. Monitor Co2 concentrations between 3 and 6 feet above the floor in all densely occupied spaces 2. Measure the minimum outdoor airflow rate for non-densely occupied spaces.
EQ c1- Outdoor Air Delivery Monitoring: What defines a densely populated space?
25 people per 1,000 sq ft
EQ c1- Outdoor Air Delivery Monitoring: What is required for exemplary performance?
There is no exemplary performance
EQ c1- Outdoor Air Delivery Monitoring: Were should CO2 sensors be located within the space?
Between 3 and 6' above the floor
EQ Credit 1: Outdoor Air Delivery Monitoring: What is the reference standard?
There is no reference standard.
EQ c1- Outdoor Air Delivery Monitoring: When should an alarm be generated by the CO2 monitoring system?
When conditions vary 10% or more from setpoint
EQ c1- Outdoor Air Delivery Monitoring: What should the Co2 monitoring equipment do for excessive readings?
Generate an alarm via BAS to bldg operator OR trigger a visual/audible alarm to bldg occupants
EQ c2- Increased Ventilation: For mechanically ventilated spaces, breathing zone outdoor air must be increased by what percentage over EQp1 ?
30%
EQ c2- Increased Ventilation: For mechanically ventilated spaces, what is one strategy to reduce the additional energy consumption required for higher ventilation rates?
Use a heat recovery system
EQ c2- Increased Ventilation: Although ASHRAE 62.1-2004 is usually the reference standard for O/A requirements, what other standard might be applicable?
ASHRAE 62.2 -2004 for Low-Rise Residential Bldgs
EQ c2- Increased Ventilation: For Naturally ventilated spaces, ventilation systems must meet the recommendations of what standard?
Carbon Trust Good Practice Guide 237
EQ c2- Increased Ventilation: For Naturally ventilated spaces, what is the flow diagram process that needs to be followed to prove it is an effective strategy?
Chartered Institution of Building Services Engineers (CIBSE) Applications manual 10;2005
EQ c2- Increased Ventilation: For Naturally ventilated spaces, if using a multi-zone, analytic model to predict natural ventilation, what percentage of occupied spaces must proven to meet ASHRAE 62.1-2004 minimums?
90%
EQ c2- Increased Ventilation: For Mechanically Ventilated Spaces, what calculations must be done?
Table showing ventilation rates for each space are 30% above ASHRAE 62.1- 2004 minimums
EQ c2- Increased Ventilation: For Naturally Ventilated Spaces using CISBE compliance path, what calculations must be done?
Calcs demonstrating how opening sizes for operable windows, trickle vents and louvers were determined i.a.w.. the CISBE standard
EQ c2- Increased Ventilation: For Naturally Ventilated Spaces using Macroscopic, multi-zone compliance path, what calculations must be done?
Provide predicted room by room O/A flows compared to ASHRAE 62.1 mins
EQ c2- Increased Ventilation: For Mechanically Ventilated Spaces, what 2 items are included with the submittal docs?
1. Confirmation that O/A rates are >=30% above AHSRAE 62.1 or local code (whichever more stringent) 2. Narrative describing the vent system design including specific O/A rates for each occupied zone
EQ c2- Increased Ventilation: For Naturally Ventilated Spaces, what 2 items are included with the submittal docs?
1. Confirmation that design meets Carbon Trust Good Practice Guide 2. Narrative describing the design method utilized including info regarding calculation methodology and/or model results
EQ c2- Increased Ventilation: Is this a design or construction submittal?
Design
EQ Credit 2: Increased Ventilation: What is required for exemplary performance?
There is no exemplary performance
EQ c3.1- Construction IAQ Management Plan-During Construction: What is the reference standard pertaining to filtration media?
ANSI/ASHRAE 52.2-1999 Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: Is this a design or construction submittal?
Construction
EQ c3.1- Construction IAQ Management Plan-During Construction: Is this a design or construction submittal?
Construction
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What 3 items should be included with the submittal docs?
1. Confirmation of approach (pre-occ flush out, flush out w/ early occ, IAQ testing) 2. Copy of projects IAQ testing report (if applicable) 3. Narrative of project specific flush out procedures & IAQ testing process & results
EQ c3.1- Construction IAQ Management Plan-What 4 pieces of info should be included pertaining to the filters used during construction?
1. Manufacturer 2. Model # 3. MERV rating 4. Location where installed
EQ c3.1- Construction IAQ Management Plan-What 4 items should be included with the submittal docs?
1. Copy of projects IAQ mgmt plan 2. Confirm if perm AHUs used during construction 3. Photos to highlight IAQ practices 4. List all filters used during const & confirm replaced B4 occ 5. Optional narrative of specials
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What is the maximum levels with the ventilation system operating in minimum O/A mode for Formaldehyde & Carbon Monoxide?
50 ppb for Formaldehyde; 2 ppm above Outdoor levels for CO
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What is the maximum concentration levels with the ventilation system operating in minimum O/A mode for PM10, TVOCs, & 4-PCH?
PM10=50 micro-grams/m3; TVOCs=500; 4-PCH=6.5
EQ c3.1- Construction IAQ Management Plan-During Construction: What is required for exemplary performance?
There is no exemplary performance.
EQ c3.1- Construction IAQ Management Plan-During Construction: What are the 3 requirements of the IAQ mgmt plan?
1. Meet or exceed recommended control measures of SMACNA 2. Protect stored and installed absorptive materials from moisture 3. Use MERV 8 or better filters if using building AHUs during construction and replace with new immediately B4 occupancy
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What are the two options for compliance?
1. Flush Out 2. Air quality testing
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: During a complete pre-occupancy flush out, how much air must be supplied?
14,000 cu. ft. per sq ft of floor area
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What are the minimum filtration requirements for AHUs under Option 1 Flush Out?
MERV 8 OR MERV13 if EQ3.1 desired
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: During a complete pre-occupancy flush out, what must the internal temperature and relative humidity be?
60 degrees F minimum 60% humidity maximum
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: Before Occupancy-During a partial pre-occupancy flush out, how much air must be supplied prior to occupancy?
3,500 cu ft per sq ft of floor area
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: Before Occupancy-for a partial pre-occupancy flush-out, following the initial pre-occupancy flush out, what is the daily time frame for the tier 2 flush out?
Begin 3 hours before occupancy and continue during occupancy
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: For a partial pre-occupancy flush-out, how long should the flush out process be carried out?
Until a total of 14,000 cu ft per sq ft of floor area of OA has been delivered to the space
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: For a partial pre-occupancy flush-out, following the initial pre-occupancy flush out, what is the minimum ventilation rate required during initial occupancy?
.30 cfm/sq ft or design minimum established in EQp1, whichever is greater
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: If complying by the air quality testing method, what are 5 criteria governing the collection of samples under Option 2 Air Quality Testing?
1. Sample each portion of the building served by separate ventilation systems 2. No less that one sample per 25,000 sq ft 3. Sample areas w/ least ventilation & greatest source strengths 4. Take samples 3-6' above the floor 5. Take samples for 4 hours min
EQ Credit 3.2: Construction IAQ Management Plan: Before Occupancy-If complying by the air quality testing method, what is the reference standard to be followed?
US EPA Compendium of Methods for the Determination of Air Pollutants in Indoor Air
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What are the five major chemical contaminants?
1. Formaldehyde 2. Particulate Matter (PM10) 3. Total Volatile Organic Compounds (TVOC) 4. 4-PCH, 4-phenylcylohexene 5. Carbon Monoxide (CO)
What is intent of EQ credits 3.1 & 3.2 : Construction IAQ MGMT Plans?
Reduce indoor air quality problems resulting from the construction/renovation process in order to help sustain the comfort and well-being of construction workers and building occupants.
EQ Prerequisite 1: Minimum IAQ Performance: Is this a design or construction submittal?
Design
EQ p1 Minimum IAQ Performance: What are the three basic methods for ventilating a building?
1. Active ventilation (mechanical) 2. Passive ventilation (Natural) 3. Mixed-Mode ventilation
EQ p1 Minimum IAQ Performance: What is required for exemplary performance?
There is no exemplary performance
EQ p1 Minimum IAQ Performance: Natural Ventilation Systems shall comply with?
Ventilation Rate Procedure (AHSRAE 62.1) or local code, whichever is more stringent.
EQ p1 Minimum IAQ Performance: The outdoor air requirements specified in ASHRAE 62.1-2004 are made up of how many parts?
2, occupant portion and zone floor area portions
EQ p1 Minimum IAQ Performance: Mechanical Ventilation Systems must be designed to in accordance with what 2 criteria?
Paragraph 5.1 of ASHRAE std 62.1-2004
EQ Prerequisite 1: Minimum IAQ Performance: What is the reference standard?
ASHRAE 62.1-2004 (sections 4 - 7)
EQ p2- Environmental Tobacco Smoke (ETS) control: For option 2, what criteria must be met for indoor smoking rooms?
1. Vented directly to the outdoors, no Recirc of ETS air 2. Enclosed with deck to deck impermeable partitions. 3. Negative pressure of 0.02" wc. Avg & .004 Min.
EQ p2- Environmental Tobacco Smoke (ETS) control: Option 3 Residential buildings should do what 4 things to meet the requirements for this credit?
1. Prohibit smoking in Common Areas 2. Locate Exterior Smoking >25 feet. 3. Minimize uncontrolled pathways for ETS transfer between residences 4. Weatherstrip doors to common hallways
EQ p2 Environmental Tobacco Smoke (ETS) control: Is this a design or construction submittal?
Design
EQ p2: Environmental Tobacco Smoke (ETS) control: For all 3 compliance paths, what should be included with the submittal?
1. Confirmation that requirements are met 2. Optional narrative of specials
EQ p2: Environmental Tobacco Smoke (ETS) control: For the interior smoking and residential options, drawings documenting what 3 things should be included with the submittal?
1. Locations of smoking rooms 2. Designed area separations AND 3. Dedicated ventilation systems.
EQ p2- Environmental Tobacco Smoke (ETS) control: The simplest compliance path is option 1 which requires two things. What are they?
1. Prohibit smoking indoors. 2. Outdoor smoking areas must be 25' from entryways, operable windows, and air intakes.
EQ Prerequisite 2: Environmental Tobacco Smoke (ETS) control: What is the reference standard for Conducting Blower Door Tests?
ANSI/ASTM E779-03 Standard test method for determining air leakage rate by fan pressurization
EQ Prerequisite 2: Environmental Tobacco Smoke (ETS) control: What is the reference standard for sampling methodology in Residential Blower Door Tests?
Residential manual for compliance with California's 2001 Energy efficient standards- Chapter 4
EQ p2- Environmental Tobacco Smoke (ETS) control: What must be done for exemplary performance?
There is no exemplary performance.
EQ c3.1- Construction IAQ Management Plan-During Construction: What is the basic requirement for achieving this credit?"
Develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and pre-occupancy phases of the building
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: When should the IAQ testing be started for Option 2?"
After construction, prior to occupancy, and with all interior finishes installed
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: When should the required measurements be taken under Option 2 Air Quality Testing?"
prior to occupancy, but during normal occupied hours
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What are 2 two requirements for meeting this credit using option 2?"
1. Conduct baseline IAQ testing using testing protocols consistent w/ EPA Methods 2. Demonstrate that max levels for contaminants are not exceeded.
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What is required if a sampling point exceeds maximum levels under Option 2 Air Quality Testing?"
Conduct addl flush out, retest specific parameters using same sampling locations as 1st test
EQ p2- Environmental Tobacco Smoke (ETS) control: What are the 3 options for meeting this pre-requisite?
OPTION 1- No Smoking in the Building OPTION 2- Interior Smoking in Designated Areas OPTION 3- Residential Bldg No Smoking in Common Areas
How are composite wood and agrifiber products defined?
Particleboard, medium density fiberboard (MDF), plywood, wheatboard, strawboard, panel substrates, and door cores. Materials considered fit-out, furniture, and equipment (FF&E) are not included.
How is comfort system control defined for Controllability of Systems?
Control over one of the following factors: air temperature, radiant temperature, air speed, and humidity.
How many points are available for Construction IAQ Management Plan?
Two
How many points are available for Controllability of Systems?
Two
How many points are available for Daylight & Views?
Two
How many points are available for Increased Ventilation?
One
How many points are available for Indoor Chemical & Pollutant Source Control?
One
How many points are available for Low- Emitting Materials?
Four
How many points are available for Outdoor Air Delivery Monitoring?
One
How many points are available for Thermal Comfort?
Two
How many points can you achieve from Indoor Environmental Quality?
15
How many pre-requisites are their for Indoor Environmental Air Quality
2
Name the prerequisites in the EQ Section
1. Minimum Indoor Air Quality Performance and 2. Environmental Tobacco Smoke Control.
EQ p2- Environmental Tobacco Smoke (ETS) control: For option 2- interior smoking rooms, for the required differential pressure test, what is the minimum test length and max sampling interval?
Min of 15 minutes (min.) of measurement, 1 sample at least every 10 seconds
EQ p2- Environmental Tobacco Smoke (ETS) control: For option 2- interior smoking rooms, for the required differential pressure test, the pressures in the smoking room are measured relative to what?
Each adjacent area & each adjacent Vertical Chase with each space configured for worst case for transport of air out of smoking room.
EQ p2- Environmental Tobacco Smoke (ETS) control: Option 3 Residential buildings, When is it ok NOT to weatherstrip doors to common hallways?
If Common Hallways are pressurized w.r.t. residences AND demonstrated via Pressure Differential Test similar to OPTION 2.
EQ p1 Minimum IAQ Performance: Can the Air Quality Procedure outlined in ASHRAE 62.1-2004 e used to comply with this credit?
NO
EQ p1 Minimum IAQ Performance: What are 2 strategies for addressing minimum IAQ performance?
1. Design ventilation systems to meet or exceed minimum outdoor air ventilation rates as described in the ASHRAE standard. 2. Balance impacts of ventilation rates on energy use and IAQ to optimize for energy efficiency and occupant health.
EQ c2- Increased Ventilation: What are the 2 Compliance paths for Naturally Ventilated Spaces?
1. Chapter 2 of CIBSE Applications Manual 10: 2005, Natural ventilation in non-domestic buildings 2. Use a macroscopic, multi-zone, analytic model to predict that room-by-room outdoor air flow rates
EQ c2- Increased Ventilation: For naturally ventilates spaces, what is a good strategy to follow?
The 8 steps described in the \Carbon Trust Good Practice Guide 237
EQ c3.1- Construction IAQ Management Plan-During Construction: What are 5 strategies (control measures) that a good IAQ plan should incorporate?
1. HVAC protection 2. Source Control 3. Pathway Interruption 4. Housekeeping 5. Scheduling
EQ c3.1- Construction IAQ Management Plan-During Construction: When should the IAQ mgmt plan be completed?
Before Construction Begins
EQ c3.1- Construction IAQ Management Plan-During Construction: 2 Good strategies for ensuring compliance with this credit are?
1. Avoid using permanent AHUs for temporary htg/clg 2. Ventilate with 100% whenever possible
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What are the 2 strategies for complying with this credit?
1. Prior to occupancy, perform a building flush-out OR 2. Test the air contaminant levels in the building.
What are 2 strategies for meeting EQ p2- Environmental Tobacco Smoke (ETS) Control in Commercial Bldgs?
1. Prohibit smoking indoors AND 2. Effectively control the ventilation air in smoking rooms. For residential buildings, prohibit smoking in common areas, design building envelope and systems to minimize ETS transfer among dwelling units.
What are 2 strategies for meeting EQ p2- Environmental Tobacco Smoke (ETS) Control in Residential Bldgs?
1. Prohibit smoking in common areas AND 2. Design building envelope and systems to minimize ETS transfer among dwelling units.
EQ c1- Outdoor Air Delivery Monitoring: What are the 2 specific requirements for Mechanically ventilated spaces?
1. Monitor CO2 concentrations within all density occupied spaces AND 2. Provide a direct outdoor airflow measurement device with an accuracy of +/- 15% of the design min O/A airflow rates for non-densely occupied spaces
EQ c1- Outdoor Air Delivery Monitoring: What is the specific requirement for Naturally ventilated spaces?
Monitor CO2 concentrations within all naturally ventilated spaces
EQ c1- Outdoor Air Delivery Monitoring: Under what set of circumstances can 1 CO2 sensor be used to represent multiple spaces with a Natural Ventilation System?
If the natural ventilation design uses passive stacks or other means to induce airflow through those spaces equally and simultaneously without intervention by building occupants.
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: When must a pre-occupancy flush out occur under OPTION 1?
After construction, prior to occupancy, and with all interior finishes installed
EQ c3.2 Construction IAQ Management Plan- Before Occupancy: What are the requirements of EQ credit 3.2: Construction IAQ MGMT plan before occupancy? Option 2
air quality test conduct baseline IAQ testing. Demonstrate that the contaminant maximum concentrations listed below are not exceeded. see pg 329 for rest
EQ p2- Environmental Tobacco Smoke (ETS) control: For option 2- interior smoking rooms, for the required differential pressure test, the doors to the smoking room should be open or closed?
Closed to adjacent spaces
What are the requirements of EQ pre-req 2: Environmental Tobacco Smoke (ETS) Control? Option 2
Option 2- prohibit smoking in building except in smoking areas, locate any exterior designated smoking areas at least 25 feet away from entries, outdoor air intakes or operable windows, have designated smoking rooms that contain and remove ETS-no recirculation, performance test the air pressure of smoking room.
EQ p2- Environmental Tobacco Smoke (ETS) control: Option 3 Residential buildings, How is acceptable Sealing of Residential Units demonstrated?
Blower Door Test using progressive sampling
EQ p2- Environmental Tobacco Smoke (ETS) control: Option 3 Residential buildings, Residential Units must demonstrate what leakage rate to meet this prerequisite?
< 1.25 Sq Inches of leakage area PER 100 sf of enclosure area (sum of wall ceiling & floor areas)
EQ p1 Minimum IAQ Performance: What is required to achieve this credit?
Meet the minimum requirements of Sections 4-7 of ASHRAE 62.1-2004, Mechanical or Natural ventilation systems.
What are the requirements under Construction IAQ Management Plan?
1. Meet or exceed the recommended measures of SMACNA, 2. Protection of on site absorptive material from moisture damage, and 3. If permanently installed air handlers are used during construction, MERV 8 filters are used at every return air grill.
EQ c2- Increased Ventilation: What is the requirement for achieving this credit with Mechanically Ventilated Systems?
Increase O/A ventilation rates to all occupied spaces by >= 30% above ASHRAE 62.1 minimums.
EQ c2- Increased Ventilation: What are the 2 requirements for Naturally ventilated spaces?
1. Design system to meet recommendations of Carbon trust Good Practice Guide 237. AND 2.Document Compliance using one of the 2 Compliance Paths Use diagrams/calcs to show design meets CIBSE recommendations OR Use a macroscopic, multi-zone, analytic model to predict that room-by-room airflows will effectively ventilate ASHRAE 62.1-2004 minimums for at least 90% of occupied spaces.
EQ c2- Increased Ventilation: What is the recommended means for determining if a Natural Ventilation is an effective strategy?
Use the flow diagram process from the CIBSE Applications Manual 10: 2005
What ASHRAE standard discusses CO2?
ASHRAE Standard 62.1-2004
What does ETS mean?
Environmental Tobacco Smoke
What does the "E" stand for in EQ?
Environmental
What is EQ Credit 1 called?
Outdoor Air Delivery Monitoring
What is EQ Credit 2 called?
Increased Ventilation
What is EQ Credit 3 called?
Construction IAQ Management Plan
What is EQ Credit 3.1 called?
Construction IAQ Management Plan-During Construction
What is EQ Credit 3.2 called?
Construction IAQ Management Plan - Before Occupancy
What is EQ Credit 4 called?
Low-Emitting Materials
What is EQ credit 4.1 called?
Low-Emitting Materials - ADHESIVES & SEALANTS
What is EQ Credit 4.2 called?
Low-Emitting Material- PAINTS and COATINGS
What is EQ Credit 4.3 called?
Low-Emitting Material- CARPET SYSTEMS
What is EQ credit 4.4 called?
Low-Emitting Materials- COMPOSITE WOOD & AGRIFIBER
What is EQ Credit 5 called?
Indoor Chemical & Pollutant Source Control
What is EQ Credit 6 called?
Controllability of Systems
What is EQ Credit 6.1 called?
Controllability of Systems-LIGHTING
What is EQ credit 6.2 called?
Controllability of Systems-THERMAL COMFORT
What is EQ Credit 7 called?
Thermal Comfort
What is EQ Credit 7.1 called?
Thermal Comfort-DESIGN
What is EQ credit 7.2 called?
Thermal Comfort-VERIFICATION
What is EQ Credit 8 called?
Daylight & Views
What is Eq Credit 8.1 called?
Daylighting & Views- DAYLIGHT 75% of SPACES
What is EQ Credit 8.2 called?
Daylighting & Views - VIEWS for 90% of SPACES
What is EQ prerequisite 1?
Minimum IAQ Performance
What is EQ prerequisite 2?
Environmental Tobacco Smoke (ETS) Control
EQ c1- Outdoor Air Delivery Monitoring: What are the 2 general requirements for this credit regardless of ventilation system type?
1. Install permanent monitoring systems to provide feedback on ventilation systems AND 2. Configure all monitoring equipment to generate an alarm when the conditions vary by 10% or more from a set point.
What is the INTENT of EQc1 Outdoor Air Delivery Monitoring credit?
Provide capacity for ventilation system monitoring to help sustain occupant comfort and well-being.
What is the INTENT of EQc2 Increased Ventilation credit?
Provide additional outdoor air ventilation to improve indoor air quality for improved occupant comfort, well-being and productivity.
What is the INTENT of EQ p1 Minimum IAQ Performance?
Establish minimum indoor air quality (IAQ) performance to enhance indoor air quality in building, thus contributing to the comfort and well-being of occupants.
What is the INTENT of EQ p2 Environmental Tobacco Smoke (ETS) Control?
Minimize exposure of building occupants, indoor surfaces, and ventilation air distribution systems to Environmental Tobacco Smoke (ETS)
EQ c1- Outdoor Air Delivery Monitoring: What is the strategy for CO2 monitoring?
CO2 and airflow measurement eqpt feeding HVAC system/BAS (alarm in BAS not practical)
What Minimum Efficiency Reporting Value (MERV) standard must filtration media adhere to
A 8, as determined by ASHRAE 52.2-1999
What standard applies for the baseline IAQ test?
U.S. EPA Compendium of Methods for the Determination of Air Pollutants in Indoor Air
What standard describes thermal comfort?
ASHRAE Standard 55-2004
What standard sets the minimum for minimum IAQ performance?
Sections 4 through 7 of ASHRAE Standard 62.1-2004 (some low-rise residential projects may use ASHRAE 62.2-2004). Mechanical ventilation systems must be designed using the Ventilation Rate Procedure or the applicable local code, whichever is more stringent. ASHRAE 62.1-2004 paragraph 5.1 for naturally ventilated buildings.
A document specific to a building project that outlines measures to minimize contamination info the building during construction and to flush the building of contaminants prior to occupancy
What is a Construction IAQ Management Plan?
The nature of air inside the space that affects the healthy and well being of building occupants
What is Indoor Air Quality?
Provide by means of mechanical powered equipment, such as motor driven fans and blowers, but not by any devices such as wind driven turbine ventilators and mechanically operated windows?
What is Mechanical Ventilation?
Provided by thermal, wind or diffusion effects through doors, windows or other intentional openings in the building.
What is Natural Ventilation?
The process of supplying air and removing air from a space for the purpose of controlling air contaminant levels, humidity, or temperature within a space.
What is Ventilation?
a Ventilation Strategy that combines natural ventilation with mechanical ventilation allowing the building to be ventilated either mechanically or naturally and at times both mechanically and naturally simultaneously.
What is Mixed-mode Ventilation?
Consists of airborne particles emitted from the burning end of cigarettes, pipes and cigars, and exhaled by smokers. These particles contain about 4,000 different compounds, up to 40 of which are known to cause cancer. Also know as secondhand smoke.
What is Environmental Tobacco Smoke?
The process of treating air to meet the requirements of a conditioned space by controlling its temperature, humidity, cleanliness and distribution.
What is Air Conditioning?
The region within a an occupied space between planes 3 and 6 ft. above the floor and more than 2 ft. from the walls or fixed a/c equipment.
What is the Breathing Zone?
That part of a building that is heated or cooled, or both, for the comfort of occupants.
What is a Conditioned Space?
The Uncontrolled outward air leakage from a conditioned space through unintentional openings in ceilings, floors and walls to unoccupied spaces or the outdoors caused by pressure differences across these openings due to wind, inside-outside temperature differences (stack effect), and imbalances between supply and exhaust airflow rates.
What is Exfiltration?
The air removed from a space and discharged to outside the building by means of mechanical or natural ventilation systems.
What is Exhaust Air?
The uncontrolled inward air leakage from conditioned space through unintentional openings in ceilings, floors and walls from unconditioned spaces or the outdoors caused by the same pressure differences that induce exfiltration.
What is Infiltration?
Any combination of outdoor and transfer air intended to replace exhaust air and exfiltration.
What is Make-up Air?
The ambient air that enters a building through a ventilation system , through intentional openings for natural ventilation, or by infiltration.
What is Outdoor Air?
Air removed from a space and reused as supply air.
What is Recirculated Air?
Air that is removed from a space to be then recirculated of exhausted.
What is Return Air?
What does CIBSE stand for?
Chartered Institution of Building Services Engineers
The air delivered by mechanical or natural ventilation to a space, composed of any combination of outdoor air, recirculated air, recirculated air or transfer air.
What is Supply Air?
EQ p1 Minimum IAQ Performance: For natural ventilation systems, ventilated spaces must satisfy what 2 criteria in relation to the ventilation openings?
Permanently open to AND within 25 feet of
EQ p1 Minimum IAQ Performance: For natural ventilation systems, the minimum openable area shall be at least what?
4% of the net occupiable floor area
EQ Prerequisite 1: Minimum IAQ Performance: What items are to be included with the submittal documents for this credit?
1. Narrative of project's ventilation design (including air volumes and special conditions) PLUS Confirm compliance with Ven Rate Procedure of Para 5.1