Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
11 Cards in this Set
- Front
- Back
What are the 3 steps to safely move from Ruby East storage using Yard Power Switches |
1) Ensure TWC buttons are illuminated and proper TWC code is displayed 2) Press Call button and observe nearest switch indicator start and stop flashing 3) Observe switch points and indicators for proper alignment |
|
What do you do if you fail to see the switch indicator start and stop flashing? |
Try reselecting if that doesn't work call control |
|
How many seconds do you have to enter the track circuit when in Ruby East power switches |
30 |
|
What are the 5 steps to perform a propulsion Brake Test? |
1) Request permission from Control. 2) 2 short sounds 3) Give the train a point of power to ensure there is propulsion, and check that the brakes release. 4) Bring MDH back to Coast to assure that no objects are dragging under the train. 5) Release the motoring drum Handle while still in coast to test the "Deadman" feature and to assure full braking power. |
|
What are the 3 ways to throw a Power Switch? |
1) TWC 2) Key 3) Manual Crank |
|
To move into Storage Track East you will get what kind of signal? |
Lunar |
|
If you get a Red over Lunar when selecting into the RUBY throat what storage track are you going to? |
North ladder, Bypass Track, Ruby West |
|
If you get an Aux Fault on your panel what does it mean? |
You may have a converter /INVERTER FAILURE |
|
The LRV's primary braking system above 3 mph is? |
Dynamic Breaking |
|
The LRV's primary braking system above 3 mph is? |
Dynamic Breaking |
|
The LRV's primary breaking below 3mph is? |
Friction break |