List of Divisions (00-14)
|
00 Procurement & Contracting Requirements
01 General Requirements 02 Existing Conditions (previously Sitework) 03 Concrete 04 Masonry 05 Metals 06 Wood/Plastics/Composites 07 Thermal/Moisture Protection 08 Openings (previously Doors & Windows) 09 Finishes 10 Specialties 11 Equipment 12 Furnishings 13 Special Construction 14 Conveyors |
|
Division 00 - Procurement & Contracting Requirements
|
*instructions for procurement
*procurement/contracting/project forms *contract conditions *revisions/clarifications/modifications |
|
Division 01 - General Requirements
|
*price/payment procedures
*administrative/quality requirements *temporary facilities and controls *product/execution/closeout/performance requirements *life cycle activities |
|
Division 02 - Existing Conditions
|
*subsurface
*demolition *site/water/facility remediation *contaminated site material removal |
|
Division 03 - Concrete
|
*forming and accessories
*reinforcing *cast-in-place/precast/mass concrete *cast decks and underlayment *grouting *cutting/boring |
|
Division 04 - Masonry
|
*unit masonry
*stone assembly *refractory masonry *corrosion-resistant masonry *manufactured masonry |
|
Division 05 - Metals
|
*structural metal framing, joists, and decking
*cold-formed metal framing *metal fabrications *decorative metal |
|
Division 6 - Woods, Plastics, Composites
|
*rough/finish carpentry
*architectural woodwork *structural plastics *plastic fabrications *structural composites *composite fabrications |
|
Division 07 - Thermal and Moisture Protection
|
*dampproofing/waterproofing
*thermal protection *weather barriers *steep slope roofing *roofing/siding panels *membrane roofing *flashing/sheet metal *roof/wall specialties and accessories *fire/smoke protection *joint protection |
|
Division 08 - Openings
|
*doors/frames
*specialty doors/frames *entrances/storefront/curtain wall *windows *roof windows/skylights *hardware *glazing *louvers/vents |
|
Division 09 - Finishes
|
*plaster/gypsum board
*tiling *ceilings *floorings *wall finishes *acoustic treatment *painting/coating |
|
Division 10 - Specialties
|
*information specialties
*interior specialties *fireplaces/stoves *safety specialties *storage specialties *exterior specialties |
|
Division 11 - Equipment
|
*vehicle/pedestrian equipment
*security/detention/banking equipment *commercial equipment *residential equipment *food-service equipment *educational/scientific equipment *entertainment equipment *athletic/recreational equipment *healthcare equipment *collection/disposal equipment |
|
Division 12 - Furnishings
|
*art
*window treatments *casework *furnishings/accessories *furniture *multiple seating |
|
Division 13 - Special Construction
|
*special facility components
*special purpose rooms *special structures *integrated construction *special instrumentation |
|
Division 14 - Conveying Equipment
|
*dumbwaiters
*elevators *escalators/moving walks *lifts *turntables *scaffolding |
|
Part I, General
|
*submittals/warranties required
*project conditions *delivery/storage/handling requirements *quality assurance requirements |
|
Part II, Product
|
*information on the product
*acceptable manufacturers *applicable standards/test methods *technical requirements |
|
Part III, Execution
|
*instructions for installation
*how to prep material prior to installation *how to prep substrate to accept material *quality control methods *cleaning/protection requirements after the installation |