Explain the fundamentals of a typical battalion tent camp layout.
|
Tactical
o sufficient space for command dispersion o concealment from ground and air observation o protection from bombing and strafing attacks o protection from mechanized attack Sanitary o water supply o drainage o shade o access o site not occupied by other units in last 2 months |
|
Bailey Bridge
|
Through-type metal truss bridge with heavy timber decking, roadway carried between two
main girders |
|
Medium girder bridge
|
two girder deck bridge
- Single and Double story |
|
Mabey Johnson Bridge
|
a portable pre-fabricated truss bridge, designed for use by
military engineering units to upgrade routes for heavier traffic, replace civilian bridges damaged by enemy action or floods etc, replace assault and general support bridges and to provide a long span floating bridge capability. |
|
Discuss heavy timber construction: Bunker
|
Total Man Hours = 891
o BU = 340 o SW = 40 o EO = 3 o CN = 508 |
|
Discuss heavy timber construction: Bridge
|
Total Man Hours = 560
o BU = 560 |
|
Discuss heavy timber construction: Tower
|
Total Man Hours =191
o BU = 127 o EO = 64 |
|
Quality Control plan
|
o Provide customer satisfaction with a product that fulfills the requirement for which it
was intended o Provide craftsperson accountability for quality construction, and economical use of material within the Naval Construction Force |
|
Project Safety plans
|
o The safety plan lists the hazards and corrective action to be taken from the back of
the CAS sheets o The crew leader must ensure that the crew is properly trained and aware of all safety conditions present |