• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back
____ is defined as quality control and assurance activities instituted to achieve the quality levels established by the contract requirements
CQM
What two systems compose the CQM program?
QC and QA
Quality control, Quality Assurance
_____ is the contractors system in place during the execution of a project
Quality Control
Managing the QC system includes the following 5 parts
1. Attending the pre construction conference 2. Periodic QC meetings 3. Performance of the 3 phases of control 4. perform submittal review and approval 5. testing is performed and documented
T/F The QC inspector is not authorized to approve deviations from the plans or specs
T
The CONREP should visit the work site each day. T/F
T