• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/22

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

22 Cards in this Set

  • Front
  • Back

Guidelines for the maintenance of equipment assigned to the NCF are contained in what NAVFAC publication?

P-300

The equipment maintenance branch is normally under the supervision of a person having what rank?

E-9 CMCS A-4 Division maintenance chief

The overall responsibility for ensuring proper maintenance and repair of all automotive, construction and materials handling equipment assigned to an NMCB belongs to what person?

Maintenance Supervisor

What person is responsible for scheduled Maintenance Requirements and Preventive and Corrective Maintenance?

Light Shop Supervisor

What person should report any unscheduled repairs to a piece of CESE to the shop Supervisor?

Inspector

Under normal conditions an inspector inspects an item of equipment brought into the maintenance shop a total of how many times?

Two

What person is responsible for the maintaining the repair parts summary sheets?

Detachment RPPO

Which equipment services are included in organizational maintenance?

Lubrication and minor adjustments

What is the primary objective of preventive maintenance?

Maximize equipment availability and minimize repair cost

What type of maintenance is performed on equipment requiring major overhaul or comprehensive restoration?

Depot level maintenance

NCF equipment is inspected for safety at what standard intervals?

Once every 12 months or 12,000 miles

What form should operators of construction and allied equipment "except weight handling equipment" use as a guide when performing daily PM services?

NAVFAC 11260/4

In an NMCB what person is responsible for general supply ship service material control and delivery?

S-4

When an NMCB deploys, the initial supply of repair parts should support operations for how many days?

60 days & first 12,000 construction hours on 2-10 hour shifts

What is the lowest level of repair parts support?

O

What is the lowest level of repair parts support?

O

Repair parts for use on one make and model of equipment are known by what term?

Peculiar or part peculiar

Which part of the COSAL provides a cross-reference between part numbers and stick numbers?

III part 3

What criterion is used to determine how many technical manuals are provided to a unit for each type of vehicle assigned?

Vehicle population

Manuals in excess of COSAL quantities must be returned to M3 stock at what location?

NFELC Port Hueneme, CA

What digits of the NSN indicate the FSC that groups similar items into classes?

First four digits of the FSC

What digits in an NSN identify the country where the part was cataloged?

5th and 6th