• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/21

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

21 Cards in this Set

  • Front
  • Back
Which plan (document)contains both technical and non-technical instructions to users during set-up
Installation and Conversion plan
Which is true of Security and Internal Control-related specs?
They must be written in a testable manner.

They should be part of a living document that isupdated during each phase.

They must have signoff from security experts and testers.
A short, preliminary document that states deficiencies in existing capabilities, new or changed requirements, or opportunities for increased economy or efficiency is known as a:
needs statement
The test analysis and security evaluation report should include all of these EXCEPT:
project signoff by all team members
The document that includes the physical characteristics for storage and design is...
specifications document
A Feasibility Study should include:
Analysis of the objectives, requirements, and system concepts.

Evaluation of alternative approaches for achieving the objectives.

Identification of a proposed approach.
_________ tests tend to uncover errors that occur during coding, while _______ tests teend to uncover errors that occur in implementing requirements or design specs.
structural, functional
In the ___________, specific types of sensitive data are identiied, and the degree and nature of the sensitivity is outlined.
data sensitivity/criticality description
The __________ identifies internal control and security vulnerabilities, the nature and magnitude of associated threats, potential forloss, and recommended safeguards. This should be a living document that is updated during each phase.
risk document
Which item(s) should be present in a VV&T plan?
Detailed description of procedures.
Test data
Evaluation criteria
The functional/security specifications need to be approved...
prior to the start of coding
Which is true of the User Manual?
It should be written in non-technical terms.
It contains a full description of how to use the application.
It describes when to use the application.
Which of these are examples of structural system testing techniques?
Stress testing,
Execution testing,
Recovery testing,
Operations testing, Compliance testing,
Security testing
The Cost Benefit Analysis...
Provides stakeholders with adequate cost and benefit information.

Might be a separate doc, or might be part of the feasibility study.
The __________ is like a user manual but is more technical and geared toward Operations Personnel
Operations Manual
The document that contains the definition of what is to be produced - including operating environment and development plan, proposed methods and procedures is the...
requirements document
Identifying important quality factors involves...
Considering the basic characteristics of hte application.
Considering the life cycle implications and performing trade-offs among the tentative list of quality factors.
Ranking all quality factors and noting the most important ones.
A System Decision Paper...
Records essential information such as: mission need,
milestones, threshholds, issues and risks, etc.

Is the master document related to the whole SDLC.

Will eventually include signoffs that the app is operating properly.
T or F: The ideal software testing process involves testing artifacts produced during development, such as requirements documents and design specifications.
True
Determining how the system functions when subjected to large volumes is known as:
Stress testing
The document that includes all goals and activities for all phases, including resource estimates, methods for design, documentation, etc. through to installation and operation, is...
the project plan