• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/29

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

29 Cards in this Set

  • Front
  • Back
a network of facilities that procures raw materials, transforms them into intermediate subassemblies and final products products and then delivers the products to customers through a distribution system
supply chain
Performance of suppliers directly affects the ______ and ______ to satisfy customers
reliability, ability
The connective relationship between ______, ______, and ______ is important and timely to improve quality along with on-time performance.
suppliers, producers, consumers
A systematic means for examining the activities a firm performs and how those activities interact
Value Chain
______ activities add value for the customer: inbound logistics, operations, outbound logistics, marketing and sales, and service
Core
______ activities have costs but no effect on the customer: bureaucratic processes including infrastructure, human resource management, technology development, and procurement.
Support
The chain of ______ - people performing different functions; internal customers
customers
______ is an extension of the value chain
Supply chain management
Supplier partnering deals with managing ______.
* Closer relationship with ______ suppliers
* ______ purchasing, low inventory
* ______ sourcing vs. ______ sourcing
* Suppliers as de facto ______
* ______
inbound logistics
* fewer
* lean
* single, dual
* subsidiaries
* verticalization
With supplier partnering, you have to consider ______ vs. ______.
cost reduction, reliability
Transportation, labor dispute, closed borders, lengthy inspections, and natural disasters are examples of supply chain ______.
disruptions
Supplier partnering deals with adjusting ______ model.
lean-inventory
Supplier partnering deals with minimizing supply chain ______ by building up ______ for critical parts.
disruptions, inventory
During ______ with suppliers, there is one person or a team for each supplier. The supplier has access to information.
communications
______
* linking information systems
* real-time updates
* balanced production system (bottleneck)
* reduced set up times (lead times)
Electronic data interchange (EDI)
Dell
* ______ to order
* minimize ______ and ______
* assemble
* supply chain, inventory
Bose
* reduced ______ department
* empowered suppliers to write their own ______
* ______-managed inventory (VMI)
* purchasing
* order
* vendor
One variable which affects what customers want from their suppliers is the customer's position in the ______.
{contingency perspective to supplier partnering}
supply chain
______ are marginally more interested in relationships than ______.
Suppliers, customers
Variability is ______ to quality: supplier's processes must be consistent with those of the customer.
{A supplier development program: ISO/TS 16949}
anathema
______: a single standard for certifying automotive suppliers
ISO./TS 16949
1-3 - Introduction and Preface
4 - Quality Management System (general requirements, control of documents, and records)
5 - Responsibility of the management
6 - Management of resources
7 - Product realization
8 - Measurement, Analysis, and Improvement
Sections of ISO/TS 16949
A supplier development program: ISO/TS 16949
- Management Responsibility
* Documentation of the ______ and ______ of quality management and ______ improvement
* Developing policy, quality objectives, managerial review, and providing resources, etc.
* development, implementation, continuous
A supplier development program: ISO/TS 16949
- Resource Management
* Responsible for providing ______ that are used to maintain the quality management system and to meet ______ requirements
* ______ and ______ for human resources
* ______ - buildings, equipment, support systems, etc.
* Appropriate work environments
* resources
* Training, development
* Infrastructure
A supplier development program: ISO/TS 16949
- Product Realization
* ______ and ______
* Designs for ______-related
* Also for purchasing, suppliers, control plans, setups, preventive maintenance, traceability, etc.
* Product, process
* customers
A Supplier Development Program: ISO/TS 16949
- Measurement, Analysis, and Improvement
* Documentation to demonstrate product ______, ______ management system conformity, and continual improvement of the ______
* Statistical tools, measurement system, customer satisfaction measurement, internal audits, etc.
* conformity, quality, quality
the technique used to verify that incoming products from a supplier adhere to quality standards
Acceptance sampling
______ vs. continual improvement is controversial
AQL
AQL is needed when:
* dealing with ______ suppliers
* products can be damaged in ______
*during ______ and building ______ products
* inproven
* shipment
* start-ups, new