Can't satisfy demand without
|
Capacity
|
|
Capacity
|
Throughput or number of units if so we can hold, receive, store, or produce in a time period
|
|
Design capacity
|
maximum theoretical output of the system a.k.a. rate
|
|
Effective capacity
|
what a firm expects to achieve given current operating constraints
|
|
Utilization
|
Percent of design capacity actually achieve
|
|
utilization=
|
actual output/ design capacity
|
|
Efficiency
|
Percent of effective capacity actually achieve
|
|
efficiency=
|
actual output/effective capacity
|
|
Capacity considerations
|
Forecast demand accurately, next technology increments and sales volume, find the optimum operating size, build for change
|
|
What you do when demand exceeds capacity
|
Raising prices, scheduling longer lead time or increase capacity
|
|
Capacity exceeds demand what do you do
|
Stimulate market, product changes
|
|
How do you adjust to seasonal demands
|
Responsive complementary demand patterns
|
|
Capacity analysis
|
Determines the throughput capacity of workstations in the system
|
|
Bottleneck
|
Limiting factor or constraint. lowest effective capacity system
|
|
Bottleneck time
|
The time of the slowest workstation in the production system
|
|
Throughput time
|
Time it takes a unit to go through production start to finish
|
|
Five-step process for recognizing in managing limitation
|
Identify constraint, develop plan to overcome, focus resources on previous step, reduce effects by offloading work or expanding capability, Once overcome go back to step on and find new constraint
|
|
Breakeven analysis
|
Objective is to find a point in dollars and units that which cost equals revenue
|
|
BEP=
|
F/P-V
|