Benefits of ERP systems include all of the following EXCEPT: |
Easy implementation. |
|
Planning for which of the following products would see the LEAST benefit from the use of an MRP system? |
Shampoo |
|
Materials requirement planning (MRP) systems are used primarily to: |
Plan materials |
|
Constant changing of the master schedule and the resulting changes in the requirements for components is referred to as: |
System nervousness |
|
A bill-of-materials file contains: |
Lists of materials required to produce end item products |
|
Advanced planning and scheduling systems: |
Use logic similar to the logic found in MRP. Consolidate all business planning systems and data throughout an organization. Integrate materials and capacity planning into one system. **A and C |
|
A lead profile is used in: |
CRP |
|
The MPS does not consider whether the critical resources needed to complete the end items according to schedule are available. T or F? |
True |
|
Software that consolidates all of the business planning systems and data throughout an organization is: |
ERP |
|
MRP is a process that would be most applicable in which situation? |
Planning requirements for bicycle seats in a bicycle production plant.
(MRP is used for dependent demand items. Only this is a dependent demand item ) |
|
Zanda Company is looking for a requirements planning system to help plan replenishment of its finished goods throughout its network of distribution centers. The type of system Zanda should consider is known as: |
DRP |
|
The positioning and replenishment of finished goods inventories at the retail level can be determined using: |
DRP |
|
If the cumulative lead time is 8 weeks, to be feasible the MPS planning horizon must be: |
At least 8 weeks. |
|
______ determines is sufficient labor, equipment, space, and suppliers are available when needed for production. |
CRP |
|
The ____ lot-sizing strategy's order is placed for exactly the amount that is needed in each period. |
Lot-for-lot |
|
MRP |
Materials Requirements Planning Calculates when and how much of raw materials, parts, and subassemblies are needed for production. |
|
DRP |
Distribution Requirements Planning Plans when and how to supply finished goods at the right time to the right places |
|
CRP |
Capacity Requirements Planning Determines if sufficient resources (labor, equipment, space, suppliers) are available when needed for production. |