• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/18

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

18 Cards in this Set

  • Front
  • Back

Define the four prerequisites of the EA category (energy and atmosphere)

Fundamental commissioning of building energy system, minimum energy performance, building-level energy monitoring, fundamental refrigerant management

HVAC&R

Heating, ventilation, air conditioning, and refrigeration

Name the benefits of a CxA (commissioning agent/authority)

Minimize or eliminate design flaws, avoid construction defects, avoid equipment malfunctions, ensure preventative maintenance is implemented during operations

What is the baseline for energy performance

ASHRAE 90.1-2010

Define the uses of regulated energy

Lighting, HVAR, service water for domestic and space heating purposes

Define the uses of process energy

Computers, office equipment, kitchen refrigeration, cooking, washing and drying machines, elevators

According to what protocol chlorofluorocarbons (CFCs) and hydrochlorofluorocqrbons (HCFCs) are banned and have to be phased out

According to the Montreal Protocol since they have the biggest impact on the ozone depletion

ODP

Ozone depleting potential

GWP

Global warming potential

On what base are refrigerant evaluated

Based on ODP and GWP

Four strategies to address the EA category

Energy demand, energy efficiency, renewable energy, ongoing energy performance

Four strategies to address energy demand

Establish design and energy goals, size the building appropriately, use free energy, insulate

What is California's Title 24

Another energy standard together with ASHRAE 90.1

Six strategies to use energy more efficiently

Address the envelope, install high performance mechanical systems and appliances, use high efficient infrastructure and traffic signals, capture efficiencies of scale, use energy simulation, monitor and verify performance

REC

Renewable energy credits

Two strategies to incorporate renewable energy

Generate on-site renewable energy, purchase green power or renewable energy credits

Four strategies to ensure optimal performance

Adhere to the OPR (owner's project requirements), provide staff training, conduct preventive maintenance, create incentives for occupants and tenants

What are the largest energy sources according to the International Energy Audit

Coal, oil, natural gas