• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back
forward scheduling
scheduling that begins in the schedule as soon as the requirements are known
backward scheduling
scheduling that begins with the due date and schedules the final operation first and the other job steps in reverse order.
critical ratio
time remaining/workdays remaining

also

due date-todays date/work (lead) time remaining
Johnson's rule
an approach tha tminimizes processing time for sequencing a group of jobs through tow work centers while minimizing total idle time in the work center.r
bottlenecks
an operation that limits output in the production sequent