• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/36

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

36 Cards in this Set

  • Front
  • Back

Hpac max pressure and relief pressure

Cuts off at 5000 psi

Snc 15' lot and LET load and relief pressure

Load to 250 psi relieves at 275

02 system how many bottles and working pressure and size of filter

4 k bottles working pressure of 1800 psi with a 10 micron filter

Specialty gas system

50/50 heo2 4 k bottles working pressure 1800 psi

HP AIR FLASKS WORMING PRESSURE AND RELIEF AS WELL AS FLOODABLE VOLUME

WP 5000


RP 5500


FV 34.2cffv per flask

Main chamber reduction panels(drive air)

Load to 425 psi, 450 is the working pressure relieves at 495

Bibs o2 reduction panel

Bank 1 and 2 reduced to 125


Reliefs at 140

Bibs specialty gas

Reduced to 125


Relief lifts at 140

Air bibs

Set at 125 psi


Relief lifts at 140


Used in the event of contaminated atmosphere or fire in the chamber

FES REDUCTION PANEL

deluge loaded to 200psi


Hand held loaded to 150 psi


6 check valves on panel allow for combining bank 1 and 2 Air to run FES without cascading banks (cross contamination)

Main chamber floodable volume inner and outer lock

Inner 775 scf


Outer lock 225 scf

Main chamber rated to and relief

81 psi relief also lifts at 81 psi

Main chamber certified to

165 fsw

Main chamber max personnel

16 14 students 2 tenders


Can also support for more in the outer lock

Main chamber max personnel

16 14 students 2 tenders


Can also support for more in the outer lock

How many check valves on the main chamber

8 for on the inner and 4 on the outer, wired in the open position

Standard navy chamber (SNC)


Floodable volume

Inner-148.94 scf


Outer 80.22 scf

Standard navy chamber (SNC)


Floodable volume

Inner-148.94 scf


Outer 80.22 scf

SNC what is it rated to and certified to and max personnel

Rated to 110 psi


Certified to 225fsw


Max personnel -4

Standard navy chamber (SNC)


Floodable volume

Inner-148.94 scf


Outer 80.22 scf

SNC what is it rated to and certified to and max personnel

Rated to 110 psi


Certified to 225fsw


Max personnel -4

Bibs in SNC

4 in the inner


3 in outer

Treatment table 6a

Back (Definition)

Treatment table 6a

Back (Definition)

Treatment table 8

Back (Definition)


For deep uncontrolled ascents, when more then 60 minutes of decompression has been missed

Treatment table 9

90 minutes of 02 at 45 feet


Used for residual symptoms of AGE after treatment


Descent 20ft/m ascent is also 20

When would you constantly vent?

Loss of power, loss of analox

Chamber levels

1-5minutes away


2-1 hour


3-6 hours

Treatment table 4

Used when determined the patient will receive significant relief at a depth not to exceed 165fsw the time at depth shall be between 30 and 120 minutes . Patient will get on o2 immediately at 60 foot stop. Descent 20ft/m ascent 1 foot/m

Chamber temperature limitations and times

84 and below unlimited/all tables


85-94 6 hours/ 1, 5, 6, 6a, 9


95-104 2 hours/ 5, 9

Treatment table 6

AGE


Type II dcs


Type I dcs or where relief is not complete within 10 minutes at 60 feet


Can be lengthened up to two additional 25 minute periods

6 nevers

1)Never wait for bag recesitator


2)Never leave patient in cramped position


3) never change a table without DMO approval


4) never administer oxygen deeper than 60 feet


5)never stop chest compressions for more than 10 seconds


6) never fail to treat a doubtful case

Treatment table 5

Type I dcs when no abnormalities have been discovered from a nuero


40 minutes of o2 at 60 feet, then slide to 30 ft remaining on o2 for 30 minutes then 20 minutes of o2 again at 30 then slide to surface

Emergency line up

Open top two valves on primary and secondary


Verify o2 is open


Go to main chamber room open o2 bibs panel open inlet set to 125 psi open outlet


Open air inlet set to 125 psi open outlet


Open drive air and set to 400 creeps to 425


FES panel open deluge to 200


Handheld to 150

Treatment table 1a

Depth 100 feet


Descent 20


Ascent 1

Allowable o2 and co2

O2 19-25%


Co2 1.5 sev