Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
36 Cards in this Set
- Front
- Back
Hpac max pressure and relief pressure |
Cuts off at 5000 psi |
|
Snc 15' lot and LET load and relief pressure |
Load to 250 psi relieves at 275 |
|
02 system how many bottles and working pressure and size of filter |
4 k bottles working pressure of 1800 psi with a 10 micron filter |
|
Specialty gas system |
50/50 heo2 4 k bottles working pressure 1800 psi |
|
HP AIR FLASKS WORMING PRESSURE AND RELIEF AS WELL AS FLOODABLE VOLUME |
WP 5000 RP 5500 FV 34.2cffv per flask |
|
Main chamber reduction panels(drive air) |
Load to 425 psi, 450 is the working pressure relieves at 495 |
|
Bibs o2 reduction panel |
Bank 1 and 2 reduced to 125 Reliefs at 140 |
|
Bibs specialty gas |
Reduced to 125 Relief lifts at 140 |
|
Air bibs |
Set at 125 psi Relief lifts at 140 Used in the event of contaminated atmosphere or fire in the chamber |
|
FES REDUCTION PANEL |
deluge loaded to 200psi Hand held loaded to 150 psi 6 check valves on panel allow for combining bank 1 and 2 Air to run FES without cascading banks (cross contamination) |
|
Main chamber floodable volume inner and outer lock |
Inner 775 scf Outer lock 225 scf |
|
Main chamber rated to and relief |
81 psi relief also lifts at 81 psi |
|
Main chamber certified to |
165 fsw |
|
Main chamber max personnel |
16 14 students 2 tenders Can also support for more in the outer lock |
|
Main chamber max personnel |
16 14 students 2 tenders Can also support for more in the outer lock |
|
How many check valves on the main chamber |
8 for on the inner and 4 on the outer, wired in the open position |
|
Standard navy chamber (SNC) Floodable volume |
Inner-148.94 scf Outer 80.22 scf |
|
Standard navy chamber (SNC) Floodable volume |
Inner-148.94 scf Outer 80.22 scf |
|
SNC what is it rated to and certified to and max personnel |
Rated to 110 psi Certified to 225fsw Max personnel -4 |
|
Standard navy chamber (SNC) Floodable volume |
Inner-148.94 scf Outer 80.22 scf |
|
SNC what is it rated to and certified to and max personnel |
Rated to 110 psi Certified to 225fsw Max personnel -4 |
|
Bibs in SNC |
4 in the inner 3 in outer |
|
Treatment table 6a |
Back (Definition) |
|
Treatment table 6a |
Back (Definition) |
|
Treatment table 8 |
Back (Definition) For deep uncontrolled ascents, when more then 60 minutes of decompression has been missed |
|
Treatment table 9 |
90 minutes of 02 at 45 feet Used for residual symptoms of AGE after treatment Descent 20ft/m ascent is also 20 |
|
When would you constantly vent? |
Loss of power, loss of analox |
|
Chamber levels |
1-5minutes away 2-1 hour 3-6 hours |
|
Treatment table 4 |
Used when determined the patient will receive significant relief at a depth not to exceed 165fsw the time at depth shall be between 30 and 120 minutes . Patient will get on o2 immediately at 60 foot stop. Descent 20ft/m ascent 1 foot/m |
|
Chamber temperature limitations and times |
84 and below unlimited/all tables 85-94 6 hours/ 1, 5, 6, 6a, 9 95-104 2 hours/ 5, 9 |
|
Treatment table 6 |
AGE Type II dcs Type I dcs or where relief is not complete within 10 minutes at 60 feet Can be lengthened up to two additional 25 minute periods |
|
6 nevers |
1)Never wait for bag recesitator 2)Never leave patient in cramped position 3) never change a table without DMO approval 4) never administer oxygen deeper than 60 feet 5)never stop chest compressions for more than 10 seconds 6) never fail to treat a doubtful case |
|
Treatment table 5 |
Type I dcs when no abnormalities have been discovered from a nuero 40 minutes of o2 at 60 feet, then slide to 30 ft remaining on o2 for 30 minutes then 20 minutes of o2 again at 30 then slide to surface |
|
Emergency line up |
Open top two valves on primary and secondary Verify o2 is open Go to main chamber room open o2 bibs panel open inlet set to 125 psi open outlet Open air inlet set to 125 psi open outlet Open drive air and set to 400 creeps to 425 FES panel open deluge to 200 Handheld to 150 |
|
Treatment table 1a |
Depth 100 feet Descent 20 Ascent 1 |
|
Allowable o2 and co2 |
O2 19-25% Co2 1.5 sev |