• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/14

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

14 Cards in this Set

  • Front
  • Back

What are the 5 phases of the SDLC?

1.systems analysis


2. Conceptual design


3. Physical design


4. Implementation and conversion


5. Operations and maintenance

Who is involved in the SDLC?

1. IS steering committee: executive level, plan and oversees IS function.


2. Project development team: plan and monitors progress


3. Programmers: write and test the programs


4. Systems analysts: determine information needs and prepare specifications for programmers


5. Management: gets users involved, provides support for the project


6. Users: communicate needs, helps design and test

What are the two plans needed for systems development?

Master plan: long range, authorized by steering committee


Project development plan: specific to a project, project team identifies hardware, software, financial resources needed

What are the two different planning techniques?

PERT - program evaluation and review technique


Gantt chart

What is a PERT?

Diagram that depicts all of the project activities that require time and resources with completion estimates. Determined critical path

What is a Gantt chart?

Bar chart that organized activities on the left and time on the right, a bar is drawn to show the progress

What 5 things are part of the feasibility analysis?

Economic- cost vs benefit


Technical- can we use existing technology?


Legal- does it comply with regulations and laws?


Scheduling- can it be done in the allotted time?


Operational- do we have the people to design and implement the system? Will it be used?

What are the 3 different types of capital budgeting?

Payback period



Net present value



Internal rate of return

What is a payback period?

The amount of time is takes for the initial cost to equal the net savings of the investment

What is net present value?

Estimated future cash flows with discounted rates to account for time value of money

What is the internal rate of return?

Calculates the interest rate that makes the present value of total costs equal the present value of total earnings

Why do people resist change?

- lack of top management support


- fear


- bad prior experience


- poor communication


- disruption


- manager change is introduced


- biases and emotions


- personal characteristics and background

How's do you prevent behavioural problems?

- management support


- satisfy user needs


- involve users


- reduce fears, emphasize opportunities


- avoid emotionalism


- provide training


- performance evaluation


- keep open communications


- test the system prior to implementation


- keep the system simple


- control users expectations

What are the steps of phase 1 in the SDLC ( systems analysis)

1. Initial investigations


2. Systems survey


3. Feasibility study


4. Information needs and system requirement


5. Systems analysis report