Cement |
The gray powder that is the glue in the concrete. The adhesive |
|
Concrete |
The mixture of Portland cement, sand,gravel and water. Used to make garage.. basement floor and sidewalks / patios |
|
Fire brick |
Brick made of refractory ceramic material which resist high temperatures |
|
Footer |
Continous 8 to 10 inch thick concrete pad installed before the supports. Footer installed first |
|
Foundation |
The supporting portion of a structure below the first floor construction. The supporting portion of the structure |
|
How long does it take till concrete is cured |
28 days |
|
Troweling helps concrete be what when finished |
While the slab is curing produces a smoothe hard finish |
|
Slump test evaluates what |
Water content in concrete mix ( some before pouring ) |
|
Screeding |
Leveling the pour to the top of form boards or screeds |
|
Laitance is what that rises to the top of concrete |
Scum |
|
Silt test is taken to find too much of what type of material |
Fine material |
|
Initial set |
Concrete when its first starting ti set |
|
Pumice is volcanic rock designed to do what |
Product lightweight concrete |
|
Hydraulic concrete can set under what |
Water |
|
Slush coat |
Pain like mixture of cement and water applied prior to a finish coat |