Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
25 Cards in this Set
- Front
- Back
Division 00 |
Procurement and Contracting Requirements Requirements for bidding and contracting including bid solicitation, instructions to bidders, information available to bidders, bid forms, the agreement (contract), bonds and certifications, and general conditions of the contract, supplementary conditions, addenda, and modifications. |
|
Division 01 |
General Requirements Requirements that are application to the entire project or all the individual technical sections. These include a summary of the work, how pricing and payment will be handles, alternates, value analysis, contract modification procedures, unit prices, construction progress documentation, submittal procedures, quality control, temporary facilities at the job site, product substitution procedures, owner-furnished items, special execution requirements, and final cleaning and protection of the work. |
|
Division 02 |
Existing Conditions
Subsurface and other investigation, site remediation, selective demolition and similar work. |
|
Division 03 |
Concrete All aspects of concrete, including forms, reinforcement, cast-in-place concrete, precast concrete, cementitious decks and underlayment, grouts, and concrete restoration and cleaning. |
|
Division 04 |
Masonry Brick, concrete block, stone, terra cotta, simulated masonry, glass block, and masonry restoration and cleaning. |
|
Division 05 |
Metals Structural Steel and other structural metals, ornamental metals, metal fabrications (metal stairs, ornamental ironwork, handrails, gratings, metal castings, and stair treads and nosings),a s well as expansion joint covers and metal restoration and cleaning. Light-Gage metal framing for partitions is located in division 09. |
|
Division 06 |
Woods, Plastics, and Composites typical structural wood framing, rough carpentry, finish carpentry, and architectural woodwork. Also: Structural plastics, plastic fabrications, wood and plastic restoration and cleaning, and the newer plastic wood and other specialty composite materials. |
|
Division 07 |
Thermal and Moisture Protection |
|
Division 08 |
Openings Metal doors and frames, wood doors and frames, specialty doors,storefronts, all types of windows, skylights, hardware, curtain walls, and glazing. |
|
Division 09 |
Finishes plaster, gypsum wallboard, (including metal framing), all types of floor and wall tile, terrazzo, all types of flooring materials, acoustical ceilings and other types of decorative ceilings, wall coverings, acoustical treatments, paints, and other coatings. |
|
Division 10 |
Specialties Visual display boards, toilet compartments, louvers, grilles, wall and corner guards, access flooring, pre-built fireplaces, flagpoles, signage, lockers, awnings, demountable partitions, storage shelving, exterior protection (sun screens, storm panels, etc.), and toilet and bath accessories. |
|
Division 11 |
Equipment Architectural equipment including vaults and security items, teller and security equipment, church-related equipment, library equipment, theater and stage equipment, musical equipment, mercantile equipment, checkroom equipment, vending machines, audio-visual equipment, loading-dock equipment, detention equipment, athletic equipment, medical equipment, mortuary equipment, and equipment for laboratories, planetariums, observatories, and offices. |
|
Division 12 |
Furnishings Furniture, systems furniture, art, window treatments, accessories, multiple seating, and interior plants. |
|
Division 13 |
Special Construction Air supported structures, special-purpose rooms (clean rooms, saunas, planetariums, etc.) seismic control, radiation protection, lightning protection, pre-engineers structures, hot tubs, and kennels |
|
`Division 14 |
Conveying Equipment Elevators, escalators, dumbwaiters, moving walks, and lifts |
|
Division 21 |
Fire Suppression Detection and alarms, all types of fire suppression systems (such as wet-pipe, dry-pipe, deluge, carbon dioxide, foam, pre-action, and dry chemical systems), as well as standpipes and hoses. Note: Fire-related materials (doors, fire-stopping, etc.) are in their respective divisions. |
|
Division 22 |
Plumbing |
|
Division 23 |
Heating, Venting, and Air Conditioning |
|
Division 25 |
Integrated Automation Specifications for expanding technology of integrated automation, including energy monitoring and control, lighting control, and similar topics. |
|
Division 26 |
Electrical NOTE: Communication, sound, and video are in Division 27 |
|
Division 27 |
Communications Computer networks and all types of communication systems (cable, telephone, internet, sound systems, etc.) |
|
Division 28 |
Electronic Safety and Security Security systems, including intrusion detection, security access, video surveillance, and related topics. |
|
Division 31 |
Earthwork Excavation and fill, grading, embankment, soil stabilization, erosion control, pile, caissons, and foundation walls. Most of this elements are below grade. |
|
Division 32 |
Exterior Improvements Mainly above-ground items such as paving, utility types of fences and gates, site furnishings, play field equipment, and planting |
|
Division 33 |
Utilities Water distribution, sanitary piping, septic tanks, sub-drainage, storm drainage, ponds and reservoirs, and constructed wetlands. |