Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
11 Cards in this Set
- Front
- Back
Five Phases to an Expeditionary Camp |
1. Planning 2. Site Survey/Security 3. Camp Establishment 4. Camp Maintenance 5. Camp Teardown |
|
Core elements that make up an expeditionary camp team? |
1.Security 2.Intelligence 3.Supply/Logistic 4.Training 5.Administration 6.Medical 7.Ops 8.Maintanence |
|
What are the four priority work classifications in order of precedence |
1. Safety 2. Function 3. Preventive 4. Appearance |
|
Planning phase has what four types of camps? |
1. Base 2. Expeditionary 3. Unit 4. Logistics Hub |
|
What is an integral component of a septic tank individual sewage disposal system? |
Leach Field |
|
List 3 facilities or structures in Phase III Camp establishments? |
1. Billeting 2. Food Service 3. Showers/Heads 4. Field Armory 5. BAS 6. Laundry 7. Administrative Services 8. MWR 9. Ministry |
|
What is potable water for? |
Suitable for drinking, cooking, and personal use. |
|
How many gallons of potable water does each person use each day? |
25 gallons |
|
Phase IV maintenance is normally run by who? |
Seabees and Contractors (KBR and Blue Diamond) |
|
What are the basic duties of First Aid Station? |
1. Emergency Response Team 2. Minor Surgeries 3. Patient monitoring 4. Medical Evacuation 5. Pharmacy and Administration |
|
How far must latrines be from water supplies or messing facilities? |
100 yards |