• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/107

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

107 Cards in this Set

  • Front
  • Back
The Subletting and Subcontracting Fair Practices Act means a prime contractor must list every sub on the bid over what percentage of the work?
1/2 percent
If a prime fails to list a sub what happens?
The prime must self perform that scope
How long does a subcontractor have to respond if they have been notified they will be replaced on a public contract due to the prime's requesting substitution?
5 days
Any prime contractor in violation of the SSFPA is subject to what disciplinary action?
1) Cancellation of contract
2) Penalty up to 10% of the amount of the subcontract
3) disciplinary action against their license
Performance bonds protect the owner from what?
Project being completed not according to plans and specs
Payment bonds protect the owner from what?
Mechanics liens
Contract bonds protect the owner from what?
From the contract not being completed and all labor and materials being paid for.
Umbrella policies cover what?
Major lawsuits above and beyond other policies
Vehicle insurance covers what?
To protect the contractor from losses associated with traffic accidents and vehicles
Builder's risk primarily insures against what?
Fire, theft, vandalism, storm, and general building problems.
General Liabilirty coverage insures damage to owner's property caused by poor workmanship. Does it also cover the poor workmanship?
NO
A contractor installs a new ceiling fan in a residence. The ceiling fan falls and damages the hardwood floor underneath? The hardwood floor will be covered by whose insurance, and whose insurance will cover the fan?
The hardwood floor is covered by the Contractors CGL but thefan is the contractors fault due to poor workmanship.
How many calendar days before a nonserious complaint must be investigated by DOSH
14 days
Toolbox meetings must be held every __ days
10 days
What is HESIS
Hazard Evaluation System and Information Service
What is the CAL/OSHA Form 300?
A log of all work related injuries
How many employees must you have to keep a Form 300 CAL OSHA?
10
How long must CAL OSHA Form 300 logs be kept?
5 years
All occupational injuries which must be reported are to be submitted on Cal/Osha Form 5020 within ___
5 days
A contractor who works on a building built before ____ must inquire if asbestos is present.
1978
What sheets must be delivered with Hazardous materials?
MSDS
How long does the employer have to report a serious injury
immediate, but no more than 8 hours
A qualifying individual can never qualify for more than how many businesses at a time?
3
The RME must work at least how many hours a week?
32( or 80% of the operating time of the business, whichever is less).
For a RME to haold more than one license they must own what % of each company.
20%
What does SWIFT stand for?
State Wide Investigative Fraud Team
How much operating capital must a someone applying for licensure demonstrate?
$ 2500.00
If a qualifying individual leaves the license, they must be replaced within ___ time.
90 days
If the name or address of a business changes, how long do you have to notify the registrar?
90 days
A bond of how much must be applied for when a new license becomes active?
$12,500.00
Bonds must be submitted within how many days of the effective date of the bond?
90 days
The contract notice must be included in all what type of contracts?
Prime contracts
Contractors should collect the price of a change order when?
When the change order is complete and not wait until the end of the entire job.
Small claims court is for claims in the amount of ____$ or less
7500$
The preliminary notice does what?
Makes the owner aware work is being done which could allow a lien to be filed if not paid.
What is a stop notice?
A lien on funds
If a prime contractor has a sub with no worker's comp and an injury happens, who is liable for the injury?
The injured employee could file a lawsuit against BOTH the prime and the sub
Who enforces CAL/OSHA standards?
DOSH
Who adopts amends and repeals safety standards?
The Occupational Safety and Health Standards Board
Who hears appeals of safety citations, orders, abatement periods, etc.
OSH appeals board
Cal/OSHA consultation service does what?
Provides free onsite safety consultation services
How long does DOSH have to investigate a nonserious violation?
14 days
A contractor's gross profit for a project is determined by ?
Amount of contract - direct costs - indirect costs = gross profit
A safe load for a 5/8" manila rope, taking the safety factor into consideration, and that the top may be old, worn, damaged, etc. is:
600 lbs
A safe unobstructed means of access, such as a walkway, stairs or ladder shall be provided to all scaffold platforms that are:
18 inches
An employer can require, under certain circumstances, his employees to work as many as ______________ days after which they will be due to get the number of days off they would normally receive in that period of time.
21
An employer who has a good record with no unemployment claims against his reserve fund will automatically qualify for a lower unemployment tax rate after ____ years.
3
An income journal always consists of:
credits and debits of equal value
An owner of property may act as a contractor or owner/builder but without a license he is restricted to building:
two structures during any three year period.
An owner posting a Notice of Non-Responsibility has _______ days to record and post the notice after finding the work being performed.
10
Before SIGNING a home improvement contract, the owner is responsible for reviewing all plans and specifications with the:
contractor.
Excavations in which the average depth exceeds the width and the width is ____ feet or less at the bottom are called trenches.
15
Extension ladders should have adequate overlap between sections. A 36 ft. ladder should have a _____ ft. overlap.
4 ft
First aid materials are required at:
all construction locations.
Fixed assets are usually shown on the balance sheet as:
cost less depreciation.
If a worker gets chemicals on his/her skin or eyes he/she should bathe the exposed area for:
15 minutes.
If a license has expired, it may be renewed by filing an application for renewal within ________years after the expiration date.
3 yrs
If a license is issued to a partnership, the qualifying partner:
(Correct Answer) cannot do work on his own outside the partnership.
If constructing a wood frame building, what safety gear would be most likely needed?
(Correct Answer) Safety glasses, a hard hat and safety shoes
If the employer monitors the work space air when chemicals are present in order to determine the level of airborne contamination:
(Correct Answer) the employee may observe this monitoring.
In order to find a quick ratio, a banker must:
(Correct Answer) deduct inventories from total current assets and divide by total current liabilities.
- Specifications of the manufacturer regarding design, erection, operation and safety must be available at the job site. All cranes exceeding ____ ton capacity need to be certified how often?
(Correct Answer) 3 - annually for tower cranes
Labor performed between the 16th and the last day of the month shall be paid for:
(Correct Answer) between the 1st and 10th days of the next month.
Nozzle guards for airless spray guns:
Correct Answer) extend the minimum distance between free hand and nozzle orifice.
On suspension (swing) scaffolds, the width of platform must be no less than __________ no more than ___________.
(Correct Answer) 14"; 36"
Prior to digging excavations or trenches, the location of the underground utilities should be determined and given to the owner _____ hours in advance.
48
The Sales and Use Tax Act of California is administered by:
(Correct Answer) the Board of Equalization
Truth in Lending Act rescission rights apply when:
(Correct Answer) a nonpurchase lien or security interest is taken in the consumer's principal dwelling.
When a contractor is working on a home improvement project and encounters exposed asbestos materials, the contractor should:
(Correct Answer) stop work and inform the owner
When the owner does not file a notice of completion, a subcontractor who has served the Preliminary Notice on time and now wishes to file a claim of lien must do so within ________ days following the completion of the structure.
Correct Answer) 90
Which are safer in terms of fire safety: low flash solvents or high flash solvents
high flash solvents
__________ of the contractor members shall be General Building Contractors.
2
According to Cal/OSHA, the ground within ____ of buildings under construction should be kept reasonably free of irregularities
wherever it is practicable.
6 ft
A company has just purchased its own building; depreciation must be calculated using:
(Correct Answer) the 31.5 year straight line.
A contractor estimates the direct costs for a project at $17,000. The project overhead expenses are generally 20 percent of the
direct costs. In order to make 20 percent profit on this project, the bid must be:
25,550
A contractor is currently building an addition on an office building. The building was built in 1976. Which of the following
statements is MOST true, according to the "Handicapped Access" Laws?
(Correct Answer) Only the addition needs to be handicapped accessible and a "path of travel" to the remodeled area is generally
required.
A CPA advises a contractor to set up a cost management system. What will this program provide?
(Incorrect Answer) It shows where profits and losses are.
Correct Answer) It gives a cost history for use in order to analyze labor and material costs.
A developer purchases a small parcel of underdeveloped land for $750,000 according to the following terms: $100,000 in cash
with a mortgage of $650,000 payable in full in 5 years, with interest at 10 percent payable quarterly. How much cash will this contract cost
the purchaser, when the contract is closed?
(Correct Answer) 100000
Double cleat ladders must not exceed ____ feet in length.
30 ft
A materialman is exempted from serving the preliminary notice if:
his invoice for the job contains all of the required information.
A worker is considered an employee rather than an independent contractor if:
Correct Answer) the worker is definitely instructed as to how to proceed with each facet of the work.
All contractors, new and old, must furnish a ________ bond or cash to be on file with the Registrar in order to maintain a valid
license.
12,500
An employee earns $15.00 per hr. and works 50 hrs. in one week. The pay for overtime is equal to time and a half; what are
the gross wages earned by this employee?
825.00
An owner can protect himself against being liened for more than the contractual price by having his contract with the contractor
recorded with:\
the County Recorder.
Cases of complaints against licensees that are contested by contractors are heard by:
the Registrar.
FICA (Social Security Taxes) are levied on:
both employers and employees.
Frequently traveled passageways, entries or exits must have a method of access installed at all points where there is a break in
elevation of _____ inches or more.
18
Henry Collins, the RME for Johnson Construction Co. also has his own construction business which he operates under a
different name and license number on weekend remodeling jobs. Is Mr. Collins operating in a legally permissible manner?
No, Collins can qualify for only the Johnson Const. Co.'s License.
If a contractor does not wish to furnish a bond or cash to the Registrar:
ncorrect Answer) None of the above
(Correct Answer) he can make arrangements with a bank or S&L to furnish a guarantee to the Registrar for the necessary
amount.
- If you are self-employed, FICA tax is:
paid at the rate set by the government for the year in which profit was earned.
In a licensed partnership, if any of the partners wish to terminate the partnership:
any of the partners can do so by writing to the Registrar.
Management should have meetings of all foremen relative to safety problems and results:
monthly.
The Contractors' State License Board requires an applicant to have a knowledge of the contracting business and to show _____
years of experience in his/her trade or trades before approval for a license.
4
The Board is composed of:
7 public members, 5 contractor members and 1 labor member.
The Board must have at least _____ regular meetings each year.
4
The California Unemployment Insurance Act is administered by:
the Department of Employment Development.
The difference between the General Ledger and the General Journal is that the journal:
Correct Answer) includes monthly adjustments, accruals and reversals of previous accruals, corrections, non-cash expenses and
any other entry that is not a receipt or a payment.
The logical source from which to obtain the amount and percentages of overhead is the:
Correct Answer) income and expense statement (profit and loss statement).
The State's share of the Sales or Use Tax is:
7.25
To enforce a stop notice, the contractor may not file a lawsuit before __________ days from serving the stop notice or after
__________ days from the expiration period for filing liens.
10 - 90
What document must an owner have with him/her when doing a walk-thru on a completed job?
Specifications and plans
What is the maximum height of a stepladder?
20 ft
When is an engineer necessary for a home improvement job?
When a building official requires that documents be prepared by an engineer, he may also require an engineer
to be on site
Which bond is most beneficial to a homeowner who is having remodeling work done on his residence?
Performance Bond
You have prepared a bid which enables you to make a profit, however the customer cannot afford it. What should you do?
Do not change your bid unless the scope of the job is reduced
Which of the following forms enables an employer to know how many deductions an employee is claiming?
A W-4 form
While they are serving on the Board, the contractor members:
Correct Answer) must remain active as contractors.